Warren Towers, BU’s biggest traditional-style residence, which was built and occupied in the mid-1960’s, will undergo a large-scale, phased full renovation of all three towers and the fourth floor, beginning in early January of 2025 and completing in the summer of 2028. During the winter months, each elevation will be fully staged in preparation to begin the remodeling work at the start of each year’s respective summer session. Each tower will be taken offline and unoccupied for a ~15-month duration and scheduled to be turned over to be opened for the start of next year’s fall semester.

On the Exterior

The entire exterior façade will be fully scaffolded to receive a complete masonry repair and restoration. All windows will be replaced, and additional insulation will be added to the exterior walls and roof areas to meet current energy codes. All roof areas and roof drainage will be replaced.

Current floor plan (left) compared to the new proposed floor plan (right).

On the Interior

Each student room and lounge will be completely remodeled, including new walls, floors, ceilings, doors, lighting, and electrical devices. Each residence room will have air conditioning.

Hallways and corridors will receive all new wall, floor and ceiling finishes, and lighting.

The existing bathrooms will be removed and replaced with private, accessible all-gender, bathrooms throughout. New services and systems will also be installed, like new plumbing, new IT infrastructure, and new security systems. The dining hall will be fully remodeled and will receive all new cooking equipment, serveries, furniture, and finishes.

Milestone Schedule

Tower A – Completion and turnover fall semester of 2026

Tower B – Completion and turnover fall semester of 2027

Tower C – Completion and turnover fall semester of 2028

Dining Hall – Completion and turnover fall semester of 2026

News and Updates

Weekly updates will be available on the project website when the project commences in early 2025.

October 2024 Town Hall Presentation
November 2024 Information Session Slides
November 2024 Information Session Recording

 

Project Team

BU Project Management: Jeffrey A. Hoseth, AIA, John Barton, David Flynn & Sonia Richards (Campus Planning & Operations); Paul Riel (Auxiliary Services)
Contracted Project Management:LeftField Project Management
Architect:Miller Dyer Spears Inc.
Structural Engineer: Souza, True & Partners, Inc.
MEP, F/P Engineer: R.W. Sullivan Engineers
Civil Engineer: Nitch Engineering
Construction Manager: Shawmut Design & Construction