Archives

Commencement 2013: Before, During, and After

Time-lapse shows it’s over in a blink

» Read More

Admissions Reception Center Construction Update 2-27-13

As part of the Sewer Separation Project in the CAS Parking Lot and the Alpert Mall we need to extend the new storm drain lines across George D. Hart Way in two locations shown on the attached plan. However, there is an existing water line in the street that needs to be dropped down lower [...]

» Read More

Snowmageddon: Getting Rid of All That White Stuff

For BU, coordination, organization is key By Amy Laskowski Watch this video on YouTube See scenes above from snowstorms at BU. Photos by Kalman Zabarsky It’s 4:30 on Tuesday morning. Bill Walter is up, responding to emails, making phone calls, and gearing up to orchestrate yet another snow removal on the BU campus. The snow [...]

» Read More

Thinking Outside the Box

  Boston University Facilities Management and Planning (FMP) is striving to adopt more innovative and efficient methods to maintain buildings and grounds. During the recent winter break, when students returned home and buildings were relatively vacant (on the Charles River Campus), the Plumbing Shop employed an unconventional method to fix a long-standing pipe problem in [...]

» Read More

Biomedical Engineering Seminar Room & Lounge

The biomedical engineering seminar room underwent renovations that included modifications to the existing entry way and walls that enlarged the room, resulting in additional seating space. The room was outfitted with new paint and carpet, energy efficient lighting control systems, and modified media equipment.  Both the seminar room and lounge got new furnishings.

» Read More

IS&T Reception Area

IS&T reception area was renovated following consolidation of IS&T staff. The space received new carpet and paint throughout the corridors as well as new lighting and ceiling tiles. The reception area furniture was also be replaced to update the space.

» Read More

Lab Animal Care Facility

Consolidation of lab animal facility for Charles River Campus to increase capacity and flexibility of the facility.  Additions to the space will include installation of a new cage washer and autoclave and  epoxy floors.  All renovations are required for facility meet ALAAC accreditation, scheduled for spring 2011.

» Read More

Engineering Admissions Suite

College of Engineering’s admissions suite, where the staff interacts with prospective students, underwent renovations to make the space more aesthetically pleasing. The suite was updated with new finishes, new ceilings, and energy efficient light fixtures. The office furniture was replace and the conference room  upgraded to include enhanced media components.

» Read More

School of Theology Classrooms

Modifications were made to two classrooms to meet both Registrar classroom and School of Theology standards. Besides refinishing surfaces, media equipment in the rooms was brought up to current standards.  Rooms received new paint, carpet, blinds and media cabinets to house necessary components.

» Read More

Chemistry Administration Suite

The Chemistry department’s administrative suite at 590 Commonwealth Avenue was completely renovated to update and reorganize the space to better meet the functional needs of the department. Renovations included opening existing partitions to create additional offices, as well as mechanical, electrical and plumbing enhancements.

» Read More