Author: Lauren Alzate
CILSE – Construction Activity – Week of 8/14/16
Installation of fibreC panels will continue on the Cummington Mall side of the building on mast climber 3 and on the Blandford Mall side on mast climber 4. Excavation along the Cummington Mall side of the site on the south side pile caps will take place to remove plate steel and complete underground utilities.
Myles Standish Hall – Construction Activity – 8/13/16 – 8/19/16
Subcontractors will receive deliveries all week between 7 a.m. and 5 p.m. on both Beacon Street and Bay State Road. Saturday Work – 8/13/16 – Permission and permitting have been secured from the City to work from 7 a.m. to 5 p.m.
Myles Standish Hall – Saturday Work – 08/13/16
On Saturday, the following construction work will be take place on site from 7 a.m. to 5 p.m. Annex alley – Start erecting staging for façade restoration. Activities will require workers, trucks, and equipment in point park area and alley.
685 Comm Ave – Overnight Power Shutdown – 8/12-8/13
Due to construction work in the building, there will be a scheduled power shutdown at 685 Commonwealth Avenue (CAS) from 10:30 p.m. on Friday, 8/12/16 until 6 a.m. on Saturday, 8/13/16.
CILSE – Construction Activity – Week of 8/7/16
For the week of August 7, 2016: Installation of fibreC panels will continue on the Cummington Mall side of the […]
Myles Standish Hall – Construction Activity – 8/6/16 – 8/12/16
Deliveries Subcontractors will receive deliveries all week between 7 a.m. and 5 p.m. on both Beacon Street and Bay State […]
Myles Standish Hall Saturday Work – 08/6/16
On Saturday, 8/6/16 the following construction work will be occurring onsite from 7 a.m. – 5 p.m. Interior cleaning and […]
BU Theatre Center – Construction Activity – 7/29/16 – 8/7/16
Now through September 2, 2016: Demolition, excavation, trenching, all underground site utilities installations, and foundation installation will be ongoing. July 30th weekend (Saturday) – Removal of demolition debris is scheduled to occur on Saturday, July 30th.
Myles Standish Hall – Construction Activity – 7/30/16 – 8/5/16
Load out at Beacon Street – Load out demolition debris from 1st floor to dumpster with ongoing daily dumpster swaps. Continue with load out down chute (interior). Demolition and load out of basement.
Fire Alarm Inspection 8/1/2016-8/7/2016
8/1.2016 Testing all rooms and common area from 7 a.m.-3 p.m. 100, 120 Ashford St, 278-286 , 300 Babcock St, 617, 619, 621 Commonwealth Ave. 8.2.2016 Testing all rooms and common area from 7 a.m.-3 p.m. 285 Babcock St, 152, 154 ,156 Bay State Rd.