Myles Standish Hall Saturday Work – 08/6/16
On Saturday, 8/6/16 the following construction work will be occurring onsite from 7 a.m. – 5 p.m. Interior cleaning and […]
BU Theatre Center – Construction Activity – 7/29/16 – 8/7/16
Now through September 2, 2016: Demolition, excavation, trenching, all underground site utilities installations, and foundation installation will be ongoing. July 30th weekend (Saturday) – Removal of demolition debris is scheduled to occur on Saturday, July 30th.
Myles Standish Hall – Construction Activity – 7/30/16 – 8/5/16
Load out at Beacon Street – Load out demolition debris from 1st floor to dumpster with ongoing daily dumpster swaps. Continue with load out down chute (interior). Demolition and load out of basement.
Fire Alarm Inspection 8/1/2016-8/7/2016
8/1.2016 Testing all rooms and common area from 7 a.m.-3 p.m. 100, 120 Ashford St, 278-286 , 300 Babcock St, 617, 619, 621 Commonwealth Ave. 8.2.2016 Testing all rooms and common area from 7 a.m.-3 p.m. 285 Babcock St, 152, 154 ,156 Bay State Rd.
Myles Standish Hall – Construction Activity – 7/23/16 – 7/29/16
Saturday 07/23/16 – Permission and permitting have been secured from the City to work from 7 a.m. to 4 p.m. Miscellaneous abatement throughout building – Interior. Complete man and material hoist loading dock on the Beacon Street side of the building.
CILSE – Construction Activity – Week of 7/24/16
Installation of fibreC panels on the Cummington Mall side of the building will continue on mast climbers 1, 2, and 3 as well as installation of vertical supports for glass on the Commonwealth Avenue side. Miscellaneous roof detailing will be ongoing, and the high roof will continue under the cooling tower.
Myles Standish Hall – Saturday Work – 07/23/16
On Saturday, the following construction work will be occurring on site from 7 a.m. to 5 p.m. Demolition throughout building – Interior. Load out of dumpsters on the Beacon Street side of the building – Dumpster will be swapped throughout the day.
Summer Construction Heats Up
Brian Kelley has a tough job ahead of him this summer. A senior project manager with Compass Project Management, Kelley is responsible for transforming a once-glamorous 1920s Boston hotel into a modern residence hall. He is overseeing the two-year gutting of BU’s oldest dorm, Myles Standish Hall, and the Annex.
BU Theatre Center – Construction Activity – 7/15/16-8/7/16
Work is scheduled to occur on the site Saturday, July 15th. W.L. French, the sitework contractor, and JC Higgins, the plumbing contractor, will be installing piping below grade for the storm and sanitary plumbing lines. Chapman Construction will also be working this Saturday at 808 Commonwealth Avenue.
CILSE – Construction Activity – Week of 7/17/16
Installation of fibreC panels on the Cummington Mall side of the building on mast climbers 1, 2, and 3, will take place this week, as well as installation of vertical supports for glass on the Commonwealth Avenue side. Miscellaneous roof detailing will be ongoing and the high roof will continue under the cooling tower.