CILSE – Construction Activity – Week of 10/9/16

Rain screen installation will continue on the Morse Auditorium side on mast climber 5 and on the Cummington Mall side from the third floor down. Ipswich Bay Glass will be working two shifts next week on this mast climber—first shift – 6 a.m. to 3:30 p.m. and second shift – 3 to 11 p.m.

Myles Standish Hall – Saturday Work – 10/1/16

Install of relieving angles in the alley on fraco. Clean and stock staging for masons in the alley and on the Beacon Street and Bay State Road sides of building. Interior rough and interior demolition. Activities will require workers, trucks, and equipment in point park area.

CILSE – Construction Activity – Week of 9/25/16

Glazing, rainscreen installation, and air-vapor barrier waterproofing will take place on the on the notch on the Morse Auditorium side of the building using mast climber 5. Installation of rainscreen will continue on the connector bridge and from the 3rd floor down on the Cummington Mall side.