Author: Lauren Alzate
Myles Standish Hall – Saturday Work – 2/18/17
Saturday work on 2/18/17 at Myles Standish Hall will include work in elevator hoist way, interior framing, and masonry washing on staging on Bay State Road.
CILSE – Construction Activity – Week of 2/12/17
The team will continue working on the fresh air intake plenum on the soffit on the Commonwealth Avenue side and the copper panel walls below soffit. Installation of sealant around exterior fibreC panels and glass on the Cummington Mall side from floors 1 to 3 will continue.
Myles Standish Hall – Construction Activity – 2/11/17 to 02/17/17
Construction work at Myles Standish Hall from February 11-17 will include the continued installation of roof, limestone, and windows, and rebuilding exterior façade on the Beacon Street and Bay State Road sides of building.
BU Theatre Center – Sunday Work – 2/12/17
In order to keep the project on schedule and make up for delays due to recent inclement weather, there will be work taking place on site between the hours of 8:00 am and 5:00 pm on Sunday, 2/12/17.
Myles Standish Hall – Saturday Work – 2/11/17
Saturday work at Myles Standish Hall will include Onsite Construction work in elevator hoist way and interior framing.
CILSE – Construction Activity – Week of 2/5/17
The team will continue working on the fresh air intake plenum on the soffit on the Commonwealth Avenue side and the copper panel walls below soffit. Installation of sealant around exterior fibreC panels and glass on the Cummington Mall side from floors 1 to 3 will continue.
Myles Standish Hall – Construction Activity – 2/4/17 – 2/10/17
Construction work at Myles Standish Hall from February 4-10 will include the continued installation of roof, CMUs, and windows, and rebuilding exterior façade on the Beacon Street and Bay State Road sides of building.
BU Theatre Center – Construction Activity – 2/3/17 – 2/17/17
Key Construction Activities: Erection of steel at the West Theater Building – Work to continue on steel columns, beams, and decking, as well as shear stud placement. Concrete Placement at Level B1 of the Parking Garage – Concrete will act as a surface on which the mechanical, electrical, plumbing, and fire protection trades will work.
Myles Standish Hall – Saturday Work – 02/04/17
On-site Construction: Interior – Install miscellaneous metals in elevator shaft. Interior framing Staging removal in the alley on the Bay State Road side of building – Will need to work in and out of the point park.
CILSE – Construction Activity – Week of 1/29/17
Ongoing sidewalk work — The sidewalk will be closed periodically along Commonwealth Avenue for vehicle access on the College of Communication (COM) and Morse Auditorium sides of the building. BUPD or BPD will be on site to direct pedestrians. As usual, Turner will notify BUPD in advance and will have both BUPD and BPD controlling public safety.