Author: Lauren Alzate
Myles Standish Hall – Saturday Work – 3/11/17
Saturday work at Myles Standish Hall will include interior framing and masonry work.
CILSE – Construction Activity – Week of 3/5/17
The portion of the south wall that was removed for the fMRI delivery will be replaced. Installation of sealant around exterior fibreC panels and glass on the Cummington Mall side from floors 1 to 3 will continue.
Myles Standish Hall – Construction Activity – 3/4/17 to 3/10/17
Construction work at Myles Standish Hall from March 3 – March 10 will include the continued installation of roof flashing, limestone, and windows, and rebuilding exterior façade on the Beacon Street and Bay State Road sides of building.
Myles Standish Hall – Saturday Work – 3/4/17
Saturday work at Myles Standish Hall will include work in the elevator hoistway, interior framing, and masonry work.
CILSE – Construction Activity – Week of 2/26/17
A portion of the south wall will be removed and replaced for the fMRI delivery on Wednesday, 3/1/17. Installation of sealant around exterior fibreC panels and glass on the Cummington Mall side from floors 1 to 3 will continue.
BU Theatre Center – Sunday Work – 2/27/17
Work will be taking place on site between the hours of 8 a.m. and 4 p.m on Sunday, 2/26/17. Permission for this work has been issued by the Town of Brookline.
Myles Standish Hall – Construction Activity – 2/25/17 to 3/3/17
Construction work at Myles Standish Hall from February 25 – March 3 will include the continued installation of roof flashing, limestone, and windows, and rebuilding exterior façade on the Beacon Street and Bay State Road sides of building.
Myles Standish Hall – Saturday Work – 2/25/17
Saturday work at Myles Standish Hall will include work in the elevator hoistway, interior framing, and staging removal on Bay State Road.
Myles Standish Hall – Construction Activity – 2/18/17 to 02/24/17
Construction work at Myles Standish Hall from February 18-24 will include the continued installation of roof, limestone, and windows, and rebuilding exterior façade on the Beacon Street and Bay State Road sides of building.
CILSE – Construction Activity – Week of 2/19/17
The team will continue working on the fresh air intake plenum on the soffit on the Commonwealth Avenue side and the copper panel walls below the soffit. Installation of sealant around exterior fibreC panels and glass on the Cummington Mall side from floors 1 to 3 will continue.