Interior Work
- Last week, the electrical rough-in work was completed and inspected.
- The metal stud framing was also completed and is set to be inspected early next week, the week of March 27.
- Installation of drywall will begin once the inspection is passed.
- Installation of the HVAC ductwork will continue.
Exterior Work
- The demolition of the curbed brick wall has been completed.
- Installation of concrete for the footing at the new canopy is tentatively scheduled for Wednesday, March 29. Once confirmed, a concrete truck will be on site to pour the footing. Police detail will be on site during this activity.
- Dumpster exchange is scheduled for Friday, March 31.