CFA Renovations – Construction Update – 7/10/20
For the period of July 10th – July 17th:

General:
The west alley entrance will remain closed over the next several weeks as work continues in the alleyway. The building can be accessed utilizing the new ramp on the east side of the building as well as the center entrance along Commonwealth Avenue. Temporary signs are posted to help direct you through the first floor.
Exterior:
East Façade
- Limestone wash down & granite cleaning and wash down will be completed by the end of the week.
South Façade
- Limestone repairs and wash down will be completed by the end of the week.
- Sidewalk repairs/patching will begin.
West Façade
- Concrete will be completed in the west alley, followed by the installation of the pavers near the art gallery vestibule.
North Façade
- Repairs to the window jambs will continue over the next several weeks.
- Work rebuilding the chimney will continue.
Archways
- Installation of window trim will continue on the archways on the east.
Interior:
On the 1st Level
- The art gallery is nearing completion, with the punch list forthcoming.
As a reminder to all, please be aware of all directional signage, as pedestrian travel paths may be altered at both the interior and exterior of the building. Your safety is imperative!