Myles Standish Hall – Construction Update – 8/9/18

For 8/11/18 to 8/17/18:

Deliveries

  • Subcontractors will receive deliveries all week between 7 am and 6 pm on both Beacon Street and Bay State Road

On-site Construction

Saturday Work – 8/11/18 – 7 am to 5 pm

  • Annex fire alarm inspection
  • Landscaping

Myles – 7 am to 6 pm

Load out

  • Load out at Beacon Street and Bay State Road – Load out debris from 1st floor to dumpsters with ongoing daily dumpster swaps

Site

  • Myles
    • Beacon Street – Continue with cut and caps
  •  Bay State Road,  Beacon Street, and Raleigh Street
    • Milling and paving

Annex – 7 am to 6 pm

Load out

  • Load out at Bay State Road and Beacon Street to dumpsters with ongoing daily dumpster swaps