For 7/21/18 to 7/27/18:

Deliveries – Subcontractors will receive deliveries all week between 7 am and 6 pm on both Beacon Street and Bay State Road.

On-site Construction

Saturday Work – 7/21/18 – 7 am to 5 pm

  • Clean up and load out
  • Interior Work – Myles
  • Annex interior framing and MEP roughs
  • Annex exterior façade work

Myles – 7 am to 6 pm

Load out

  • Load out at Beacon Street and Bay State Road – Load out debris from 1st floor to dumpsters with ongoing daily dumpster swaps.

Site

  • Myles
    • Bay State Road – Continue with cut and caps in Bay State Road
  •  Bay State Road and Beacon Street
    • Continue with installation of pavers and landscape

Annex – 7 am to 6 pm

Load out

  • Load out at Bay State Road and Beacon Street to dumpsters with ongoing daily dumpster swaps.

Roof

  • Masonry restoration
  • Roof terminations, flashings, and masonry

Masonry Restoration

  • Beacon Street , Raleigh Street , and Bay State Road continue with façade restoration

View all posts