Two existing classrooms, CGS 527 and 529, were totally renovated and combined to create a 63-seat, case-style classroom. The classroom has a Level-4 Classroom Technology package that includes lecture capture, video conferencing, and audience response. Tablet arm chairs in a third classroom, CGS 515, were replaced with movable, seminar-style tables and chairs.
Project Team
Architect: Einhorn Yaffee Prescott Architecture & EngineeringGeneral Contractor: J.K. Blackstone