Goldman School of Dental Medicine – Construction Update – 11/29/19
During the weekend of November 30: Starting at 5 a.m. on both Friday (November 29) and Saturday (November 30), crews will be replacing the existing steam heating service with a new service sized to provide heat to the existing GSDM building as well as the new north and west additions. More
Goldman School of Dental Medicine – Construction Update – 11/22/19
During the weekend of November 23: On Saturday and Sunday, work will continue throughout the interior of the seven-story west addition, with the focus on the new first-floor auditorium and student and resident lounge areas. On Saturday only, the exterior work will also continue on the north, east, and south... More
Howard Thurman Center – Construction Update – 11/22/19
Week of November 25, 2019 General: Temporary signage is posted to help the public navigate through the first floor. The main building access is through the Essex Street entrance. A secondary entrance is located on the rear of the building near the ramp to the garage. The main stairwell from the parking... More
Geothermal Well Drilling Initiative – Construction Update – 11/22/19
During the week of November 25th: Parking Lot N The drilling subcontractor has started drilling to depth at GT-6 and upon completion will move on to start drilling to depth at GT-30. The site subcontractor will be handling the soil material stockpiled in the basin area for settling. The site contractor... More
CFA Renovations – Construction Update – 11/22/19
During November 22nd - November 29th: (Please note that there is work scheduled for Saturday, November 23rd and Sunday, November 24th) General: Temporary signs are posted to help direct you through the first floor. The main building access is through the west entrance near the Concert Hall. Stair access directly off Commonwealth Ave will... More
Geothermal Well Drilling Initiative – Construction Update – 11/15/19
During the week of November 18th: Parking Lot N The drilling subcontractor will start drilling to depth at GT-1 and then, upon completion, move to GT-28 within the fenced-in area of the parking lot. The site subcontractor will be handling the soil material stockpiled in the settlement basin. This material will... More
Goldman School of Dental Medicine – Construction Update – 11/15/19
During the weekend of November 16: On Saturday and Sunday, work will continue throughout the interior of the seven-story west addition, with the focus on the new first-floor auditorium and student and resident lounge areas. Work will also continue on the north, east, and south elevations of the existing GSDM... More
Howard Thurman Center – Construction Update – 11/15/19
Week of November 18, 2019 General: Temporary signage is posted to help the public navigate through the first floor. The main building access is through the Essex Street entrance. A secondary entrance is located on the rear of the building near the ramp to the garage. The main stairwell from the parking... More
CFA Renovations – Construction Update – 11/15/19
During November 15th - November 22nd: (Please note that there is work scheduled for Saturday, November 16th) General: Temporary signs are posted to help direct you through the first floor. The main building access is through the west entrance near the Concert Hall. Stair access directly off Commonwealth Ave will be open and... More
Geothermal Well Drilling Initiative – Construction Update – 11/08/19
During the week of November 11th: Parking Lot N The drilling subcontractor will continue drilling to depth at GT-4 and then GT-1 within the fenced-in area of the parking lot. The site subcontractor will be handling the soil material stockpiled in the settlement basin. This material will be mixed and loaded... More