Author: Lauren Alzate

BU Theatre Center – Construction Activity – 1/9/17 – 1/30/16

Key Construction Activities: Placement of spray fireproofing at Production Wing – Spray fireproofing to protect the Production Wing structural steel will be applied. Access will be from site. Placement of wall framing to enclose Production Wing exterior walls – Structural metal wall studs will be placed, with openings for windows and doors.

CILSE – Construction Activity – Week of 1/8/17

Ongoing sidewalk work — The sidewalk will be closed periodically along Commonwealth Avenue for vehicle access on the College of Communication (COM) and Morse Auditorium sides of the building so sidewalk can be prepped and poured in front of Morse. BUPD or BPD will be on site to direct pedestrians, and the sidewalk will reopen after 3:30 p.m.

Myles Standish Hall – Construction Activity – 1/7/17 to 1/13/17

For 1/7/17 to 1/13/17: Deliveries – Subcontractors will receive deliveries all week between 7 a.m. and 6 p.m. on both Beacon Street and Bay State Road. Saturday Work – 1/7/17 – Interior MEP installation. Interior framing. Hoist running load out and clean up on all floors – Dumpsters will be swapped out at Beacon Street and point park.

CILSE – Construction Activity – Week of 12/18/16

The sidewalk will be closed periodically along Commonwealth Avenue for vehicle access on the College of Communication (COM) and Morse Auditorium sides of the site so granite capstones can be installed. Starting 12/22/16, removal and replacement of the concrete walkway in front of the COM entrance will begin.