Myles Standish Hall – Construction Activity – 7/29/17 to 8/4/17

Myles Standish Hall - Construction Activity - 7/29/17 to 8/4/17

For 7/29/17 to 8/4/17:

Deliveries – Subcontractors will receive deliveries all week between 7 a.m. and 6 p.m. on both Beacon Street and Bay State Road.

Onsite Construction

 Saturday Work – 7/29/17

  • Interior wall framing/taping/sanding – Annex
  • Install bathroom tile – Annex
  • Interior painting – Annex
  • Install round top windows and caulking – Annex
  • Exterior façade demolition – Beacon Street
  • Clean up and loadout – Bay State Road

 Verizon Off-Hours Work 7/30/17 to 8/3/17 

  • Verizon has informed us that they will be working on site from 7:00 p.m. to 6:00 a.m. from Sunday to Wednesday. Verizon’s work is unrelated to the project.

 Demolition/Loadout

  • Load out at Beacon Street and Bay State Road – Load out demolition debris from 1st floor to dumpster with ongoing daily dumpster swaps

Masonry Restoration (Exterior – Bay State Road and Beacon Street)

  • Continue masonry restoration and demolition – Bay State Road & Beacon Street
  • Continue installation of staging and fraco – Bay State Road, Beacon Street, and the Point

Annex

  • Install window waterproofing and blocking
  • Install windows and wood trim
  • Brick restoration – Annex alley
  • Install stairwell framing and drywall
  • Install basement wall framing
  • Load out of demolition debris – Bay State Road
  • Site deliveries – Bay State Road

Roof Myles (Exterior)

  • Continue with roof demolition

Site Utility Work

  • Utility cut and cap work – Beacon Street
  • Install man and material hoist – Beacon Street

For questions, please contact Brian Kelley.