General Project Updates
- Millwork was installed in the Residence Life spaces.
- In the dining hall, flooring was demolished, electrical wiring was put in place for new equipment and lighting, and flooring preparation was completed.
- Dye tests related to the site work were completed.
- Pull tests related to the roof work were completed.
Week of June 12th
- Rough electrical and plumbing work will continue in the dining hall.
- Floor preparation will continue.
- Work in the Residence Life space will be completed.
- Flooring installation in the elevator lobby will take place.