CFA Renovations – Construction Update – 6/26/20
For the period of June 26th – July 3rd:

General:
The west alley entrance will remain closed over the next several weeks as work continues in the alleyway. The building can be accessed utilizing the new ramp on the east side of the building as well as the center entrance along Commonwealth Avenue. Temporary signs are posted to help direct you through the first floor.
Exterior:
East Façade
- Granite cleaning and washing will be completed by the end of the week.
South Façade
- Limestone repairs and masonry punch list will continue.
West Façade
- Granite will be installed below the 1st floor windows over the waterproofing with the drainage mat to follow.
North Façade
- Repairs to the window jambs will continue over the next several weeks.
- Work rebuilding the chimney will continue.
Archways
- Installation of window trim will continue on the archways on the east & south facades.
Interior:
Basement
- Work will continue with the installation of the controls for the HVAC systems over the next two weeks.
On the 1st Level
- The student lounge is nearing completion with punch list items forthcoming.
- The art gallery office furniture delivery is set for the beginning of the week.
- Interior trim installation in the art gallery will continue.
As a reminder to all, please be aware of all directional signage, as pedestrian travel paths may be altered at both the interior and exterior of the building. Your safety is imperative!