Center for Computing & Data Sciences – Construction Update – 6/12/20
During the week of June 15th
Installation of monitoring points for utilities will continue.
Excavation within the perimeter of the site for installation of the support of excavation system will continue.
Installation of utility feeds from Granby Street to the site will begin.
In the second half of the week, a crane will mobilize to the site with equipment for the Support Of Excavation (SOE) system, installation will begin on Monday, June 22nd.
At the mock-up (766 Commonwealth Ave. parking lot), installation of the façade panels will begin.
As activity in and around the site begins to increase, please be aware of all directional signage, as pedestrian travel paths may be altered.
We will continue to provide you with up to date information via these notifications.
Surcharge material will remain in place through the end of June