Geothermal Well Drilling Initiative – Construction Update – 2/14/20

During the week of February 17th:

Parking Lot N

  • The drilling subcontractor will be pressure testing the piping within the completed borehole at GT-3.

Alleyway

  • The drilling subcontractor will be modifying existing piping at the boreholes and will be re-setting manhole & cover at grade.

Park

  • No geothermal work scheduled.

As a reminder to all, please be aware of all directional signage, as pedestrian travel paths may be altered at both the interior and exterior of the building. Your safety is imperative!