Geothermal Well Drilling Initiative – Construction Update – 11/08/19
During the week of November 11th:
Parking Lot N
- The drilling subcontractor will continue drilling to depth at GT-4 and then GT-1 within the fenced-in area of the parking lot.
- The site subcontractor will be handling the soil material stockpiled in the settlement basin. This material will be mixed and loaded into trucks for removal to a disposal facility.
- Water from the storage tanks will continue to be discharged into the storm water drainage system pending test results.
Alleyway
- No drilling is anticipated next week within the alley. Construction equipment will be periodically entering and existing the fenced-in area.
Park
- Construction equipment will be making periodic trips into the fenced area of the park to access the stockpiled materials.
As a reminder to all, please be aware of all directional signage, as pedestrian travel paths may be altered. Your safety is imperative!