Geothermal Well Drilling Initiative – Construction Update – 3/15/19
During the week of March 18:
Parking Lot Test Well #1
- Fencing will be removed, and the parking areas will be returned to BU.
Alley Test Well #2
- Fencing has been removed at the test well location and relocated to create a storage area along the retaining wall for piping, park amenities, ect.
Park Test Well #3
- Fencing has been installed around the park area and equipment will be mobilizing to the site on 3/15 and 3/18.
- This week, starting on 3/18, the drilling contractor anticipates delivery of drill rods on 3/22 and will be beginning set the steel pipe casing for geothermal test well #3. A water tank truck will periodically be crossing Granby St to access the hydrant on Bay State Rd.
As a reminder to all, please be aware of all directional signage, as pedestrian travel paths may be altered. Your safety is imperative!