Myles Standish Hall – Construction Activity – For 4/28/18 to 5/4/18
For 4/28/18 to 5/4/18:
Deliveries – Subcontractors will receive deliveries all week between 7 a.m. and 6 p.m. on both Beacon Street and Bay State Road.
Onsite Construction
Saturday Work – 4/28/18
- No work
Demolition/Loadout
- Load out at Beacon Street and Bay State Road – Load out demolition debris from 1st floor to dumpster with ongoing daily dumpster swaps
Masonry Restoration (Exterior – Bay State Road & Beacon Street)
- Continue with masonry restoration and demolition – Bay State Road & Beacon Street
- Restoration of façade at hoist location
Roof Myles (Exterior)
- MEP insulation
Site
- Point Park
- Continue with excavation and underground
- Sidewalk prep
- Charlesgate
- Continue Charlesgate bump out construction