Myles Standish Hall – Construction Activity – 1/20/18 to 1/26/18
For 1/20/18 to 1/26/18:
Deliveries – Subcontractors will receive deliveries all week between 7 a.m. and 6 p.m. on both Beacon Street and Bay State Road.
Onsite Construction
Saturday Work – 1/20/18
- Interior elevator installation – Myles
- Clean up and loadout
Demolition/Loadout
- Load out at Beacon Street and Bay State Road – Load out demolition debris from 1st floor to dumpster with ongoing daily dumpster swaps
Masonry Restoration (Exterior – Bay State Road & Beacon Street)
- Continue with masonry restoration and demolition – Bay State Road & Beacon Street
- Continue with staging installation and removal
Roof Myles (Exterior)
- Install penthouse siding, parapet cap, and MEP insulation