Myles Standish Hall – Construction Activity – 1/7/17 to 1/13/17
For 1/7/17 to 1/13/17:
Deliveries
- Subcontractors will receive deliveries all week between 7 a.m. and 6 p.m. on both Beacon Street and Bay State Road.
Onsite Construction
Saturday Work – 1/7/17
- Interior MEP installation
- Interior framing
- Hoist running load out and clean up on all floors – Dumpsters will be swapped out at Beacon Street and point park.
Verizon Off-Hours Work – 1/8/17 to 1/12/17 – Verizon has informed us that they will be working onsite from 7:00 p.m. to 12:00 a.m. from Sunday to Wednesday. Verizon’s work is unrelated to the project.
Snow Removal
- During any snow events, snow removal operations could be occurring at all hours in order to keep up with the snow and get site ready for workers. These operations will require equipment, trucking, and manpower.
Demolition
- Load out at Beacon Street – Load out demolition debris from 1st floor to dumpster with ongoing daily dumpster swaps.
- Demolition of 1st floor (interior).
Masonry Restoration (Exterior – Bay State Road and Beacon Street)
- Continue rebuilding exterior façade on the Beacon Street and Bay State Road sides of the building.
- Continue installation of concrete masonry units on the 1st
- Continue installation of windows.
Roof (Exterior)
- Continue installation of roofing.
Alley Between Annex and Myles at Bay State Road (Exterior)
- Continue installation of staging, brick, and windows.
- Eversource will be pulling wires for new service.
Site Utility Work
- No site utility work this week.
For questions, please contact Brian Kelley.