New Balance Field Construction Activity for the Period of May 13 – May 17
Anticipated construction activities for the week of May 13 – May 17:
*The contractor will NOT be working on Saturday, 5/14/2013.
1. Site & Utility Work: Already underway and continuing for the next several weeks is site work, which includes excavators, and other earthmoving equipment. You can expect general construction noise from the equipment, and construction traffic in the form of dump trucks on the surrounding streets. Excavation and hauling of soils will continue throughout the week. Truck activity for both the removal of the excavated soils, and backfilling of exterior foundations walls will be coordinated and Police details will be present to help manage traffic flow.
2. Crane Disassembly – The precast erection is complete. The 2250 Manitowoc Crawler Crane will be disassembled and trucked offsite. During this time, an increased presence of police details will be working and coordinating to help manage traffic flow.
3. Deck Waterproofing – Starting this week and continuing for the next several weeks is the waterproofing of the concrete deck. This work is entirely within the site, and should have no effect on site perimeter and will cause no increased construction activity throughout the surrounding streets.