CILSE – Construction Activity – Week of August 10, 2015
For the week of August 10, 2015: Pile driving operation will be completed next week. There will be a crane […]
CILSE – Construction Activity – Week of August 3, 2015
For the week of August 3, 2015: Installation of pressure-injected footings (PIFs) and piles will continue on Saturday (8/1) and […]
Fire Alarm Inspection 8.3.2015 – 8.7.2015
8.3.2015 Testing all rooms and common area from 7am – 3pm 11-19, 53-57 Deerfield St. 533-541 Commonwealth Ave. 677-679 Beacon […]
CILSE – Construction Activity – Week of July 27, 2015
For the week of July 27, 2015: Installation of pressure-injected footings (PIFs) and piles as well as underground utility work […]
Fire Alarm Inspection 7/27/2015-7/31/2015
7/27/2015 Testing all rooms and common area 7am-3pm 277 Babcock St. 7/28/2015 Testing all rooms and common area 7am-3pm 517,519,521,531 […]
Campus Power Outage Saturday 7/18
An emergency power outage affecting several East Campus businesses and residences will take place tomorrow, Saturday, July 18 between 2 a.m. and 2 p.m. The outage, by utility company Eversource, is necessary to repair power grid infrastructure.
CILSE – Construction Activity – Week of July 20, 2015
For the week of July 20, 2015: The contractor will be working on Saturday (7/18) to install of pressure-injected footings […]
CILSE – Construction Activity – Week of July 13, 2015
For the week of July 13, 2015: The contractor will be installing pressure-injected footings (PIFs) this Saturday (7/11). This operation […]
Boomtime for BU Construction
This summer, maintenance and building projects are ongoing on both the Charles River Campus and the Medical Campus, ranging from a new life sciences building to renovated apartments for undergrads.
CILSE – Construction Activity – Week of July 6, 2015
For the week of July 6, 2015: Excavation will continue. Trucks will be entering and exiting the site throughout the […]