CILSE – Construction Activity – Week of 3/20/16
Exterior curtain wall will continue on the north elevation, continuing on floors 6 and up. Curtain wall work will also continue on the west elevation, completing the 1st floor and moving up. Exterior wall framing will continue on the south elevation to the 9th floor.
Fire Alarm Inspection 3.21.2016 – 3.25.2016
3.21.2016 Testing all rooms and common area from 7 a.m. – 3 p.m. 820, 822, 824, 826, 828, 830 Beacon […]
CILSE – Construction Activity – Week of 3/13/16
Starting Monday, Turner will begin installing the underground electrical vault on the west side of the site. Currently the site fence is right on the edge of the excavation. Turner will be temporarily relocating the site fence in that area a few feet west, approximately 6 to 7 feet.
Subscribe for Project Notifications
If you like to receive notifications about Myles Standish Hall, sign up below. Subscribe to our mailing list * indicates […]
Contact the Project Team
CILSE – Construction Activity – Week of 3/6/16
Concrete pours are scheduled for remaining 1st floor areas. The project team will begin removing winter weather protection. Exterior curtain wall work will continue on the north elevation on floors 4 through 6.
CILSE – Construction Activity – Week of 2/28/16
The large crawler crane will be removed from the site this weekend. Operations will begin at 12 a.m. Sunday morning, will continue throughout the day Sunday until 4 p.m. and will resume at 6 a.m. Monday morning.
CILSE – Construction Activity – Week of 2/21/16
The project team will be prepping the structural steel for deck concrete pours on the west sides of the 8th and 9th floors as well as the roof. We have concrete pours scheduled every day next week.
CILSE – Construction Activity – Week of 2/7/16
Next week the project team will be prepping the structural steel for deck concrete pours on the west sides of the 7th, 8th, and, 9th floors as well as the roof. We have scheduled concrete pours for the west sides of the 7th and 8th floors, the roof, curbs, and pads.
CILSE – Construction Activity – Week of 1/25/16
During the week of January 25th, the project team will be preparing structural steel for concrete pours and continuing slab-on-deck concrete.