{"id":27124,"date":"2026-02-20T14:14:04","date_gmt":"2026-02-20T19:14:04","guid":{"rendered":"https:\/\/www.bu.edu\/cpo\/?p=27124"},"modified":"2026-02-27T15:07:26","modified_gmt":"2026-02-27T20:07:26","slug":"warren-towers-renovation-construction-update-2-20-26","status":"publish","type":"post","link":"https:\/\/www.bu.edu\/cpo\/2026\/02\/20\/warren-towers-renovation-construction-update-2-20-26\/","title":{"rendered":"Warren Towers Renovation Construction Update \u2013 2\/20\/26"},"content":{"rendered":"<h2 style=\"text-align: center;\">General Project Information<\/h2>\n<ul>\n<li><span style=\"text-decoration: underline;\">Weekday shifts run from 7:00 a.m. to 3:30 p.m. (1st shift), 9:00 a.m. to 5:00 p.m. (1st shift for work outside\/adjacent to student rooms), 3:00 p.m. to 11:00 p.m. (2nd shift), and 11:00 p.m. to 7:00 a.m. (3rd shift). Weekend shifts operate from 7:00 a.m. to 5:00 p.m.<\/span><\/li>\n<li>The team is currently in the main renovation phase of the project.<\/li>\n<li>Emergency Contacts:\n<ul>\n<li>Owner\u2019s Representative \u2013 Leftfield Project Management: Corey Davidson \u2013 508-330-8489<\/li>\n<li>Contractor Representative \u2013 Shawmut Design &amp; Construction: Matt Galloway \u2013 617-413-7758<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<h2 style=\"text-align: center;\"><b>During the weekend of 2\/21<\/b><\/h2>\n<h3 style=\"text-align: center;\"><em><b>Crews will be working 1st and 2nd shifts on Saturday and Sunday<\/b><\/em><\/h3>\n<p><span style=\"text-decoration: underline;\"><strong>Exterior Work<\/strong><\/span><\/p>\n<p><b>Tower A<\/b><\/p>\n<figure id=\"attachment27116\" aria-describedby=\"caption-attachment27116\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2026\/02\/Tower-A-progress-photo-477x636.jpg\" alt=\"\" width=\"500\" height=\"667\" class=\"wp-image-27116\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-A-progress-photo-477x636.jpg 477w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-A-progress-photo-768x1024.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-A-progress-photo-1152x1536.jpg 1152w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-A-progress-photo-1536x2048.jpg 1536w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><figcaption id=\"caption-attachment27116\" class=\"wp-caption-text\">Pictured is the progress on Tower A.<\/figcaption><\/figure>\n<p><b>4th Floor Podium Roofs<\/b><\/p>\n<ul>\n<li>Low roofs will be used as laydown areas for tools, supplies, and materials.<\/li>\n<\/ul>\n<p><b>East &amp; West Facades<\/b><\/p>\n<ul>\n<li>Masons will continue exterior brick veneer restoration work, including selective demolition and installation of restoration anchors, air-, water-, and vapor-barrier systems, new lintels, flashings, and relieving angles.<\/li>\n<\/ul>\n<p><b>Front Fa\u00e7ade and on Commonwealth Ave.<\/b><\/p>\n<ul>\n<li>Masons will continue exterior brick veneer restoration work, including selective demolition and installation of restoration anchors, air-, water-, and vapor-barrier systems, new lintels, flashings, and relieving angles.<\/li>\n<\/ul>\n<p><b>Rear Fa\u00e7ade and Back Alley<\/b><\/p>\n<ul>\n<li>Installation of windows and metal trim begins.<\/li>\n<li>Masons will continue exterior brick veneer restoration work, including selective demolition and installation of restoration anchors, air-, water-, and vapor-barrier systems, new lintels, flashings, and relieving angles.<\/li>\n<\/ul>\n<p><b>Upper Roof<\/b><\/p>\n<ul>\n<li>Work on the emergency backup generator connections continues.<\/li>\n<li>Work continues constructing the new mechanical penthouse and emergency electric room.<\/li>\n<li>Assembly and installation of the DOAS unit, piping, sheet metal ductwork, and electrical connections continue.<\/li>\n<li>Installation of metal panel roof screen begins.<\/li>\n<\/ul>\n<figure id=\"attachment27115\" aria-describedby=\"caption-attachment27115\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2026\/02\/Tower-A-Roof-Top-Equipment-477x636.jpg\" alt=\"\" width=\"500\" height=\"667\" class=\"wp-image-27115\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-A-Roof-Top-Equipment-477x636.jpg 477w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-A-Roof-Top-Equipment-768x1024.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-A-Roof-Top-Equipment-1152x1536.jpg 1152w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-A-Roof-Top-Equipment-1536x2048.jpg 1536w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><figcaption id=\"caption-attachment27115\" class=\"wp-caption-text\">Pictured is the equipment on Tower A&#8217;s roof.<\/figcaption><\/figure>\n<ul><\/ul>\n<ul><\/ul>\n<p><b>Tower B<\/b><\/p>\n<p><strong>North, south, east, and west facades<\/strong><\/p>\n<ul>\n<li>Staging crews will continue assembling scaffolding.<\/li>\n<\/ul>\n<figure id=\"attachment27113\" aria-describedby=\"caption-attachment27113\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2026\/02\/Tower-B-on-Comm-Ave.-477x636.jpg\" alt=\"\" width=\"500\" height=\"667\" class=\"wp-image-27113\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-B-on-Comm-Ave.-477x636.jpg 477w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-B-on-Comm-Ave.-768x1024.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-B-on-Comm-Ave.-1152x1536.jpg 1152w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-B-on-Comm-Ave.-1536x2048.jpg 1536w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><figcaption id=\"caption-attachment27113\" class=\"wp-caption-text\">Pictured is Tower B&#8217;s progress from Commonwealth Avenue.<\/figcaption><\/figure>\n<p><b>West Podium Terrace<\/b><\/p>\n<ul>\n<li>Assembly and installation of heat pumps and condensers, including piping and electrical connections, continues on the mechanical platform.<\/li>\n<\/ul>\n<figure id=\"attachment27111\" aria-describedby=\"caption-attachment27111\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2026\/02\/West-Terrace-Mechanical-Equipment-636x477.jpg\" alt=\"\" width=\"500\" height=\"375\" class=\"wp-image-27111\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/West-Terrace-Mechanical-Equipment-636x477.jpg 636w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/West-Terrace-Mechanical-Equipment-1024x768.jpg 1024w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/West-Terrace-Mechanical-Equipment-768x576.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/West-Terrace-Mechanical-Equipment-1536x1152.jpg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/West-Terrace-Mechanical-Equipment-2048x1536.jpg 2048w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><figcaption id=\"caption-attachment27111\" class=\"wp-caption-text\">Pictured is the west terrace mechanical equipment.<\/figcaption><\/figure>\n<p><b>Multipurpose Room Roof (Podium D)<\/b><\/p>\n<ul>\n<li>Work continues constructing the new boiler room.<\/li>\n<\/ul>\n<p><b>Cummington Mall<\/b><br \/>\n<i>(In and around the fenced area)<\/i><\/p>\n<figure id=\"attachment27112\" aria-describedby=\"caption-attachment27112\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2026\/02\/Veiw-from-the-South-636x477.jpg\" alt=\"\" width=\"500\" height=\"375\" class=\"wp-image-27112\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Veiw-from-the-South-636x477.jpg 636w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Veiw-from-the-South-1024x768.jpg 1024w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Veiw-from-the-South-768x576.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Veiw-from-the-South-1536x1152.jpg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Veiw-from-the-South-2048x1536.jpg 2048w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><figcaption id=\"caption-attachment27112\" class=\"wp-caption-text\">Pictured is the view of Warren from the south.<\/figcaption><\/figure>\n<ul>\n<li>Daily deliveries of tools, supplies, and materials will be received at the construction loading docks within the fenced area.<\/li>\n<li>Two-car personnel and materials hoist way remains in operation.\n<ul>\n<li>(Elevator operators begin daily safety checks and preventative maintenance at 6:00 a.m.)<\/li>\n<\/ul>\n<\/li>\n<li>Tower B hoist way bridge construction is ongoing.<\/li>\n<\/ul>\n<p><b>Cummington Mall West\/ Hinsdale Mall<\/b><\/p>\n<ul>\n<li><strong><span style=\"text-decoration: underline;\">BUPD detail officers and construction staff will be on-site to assist with pedestrian and vehicular traffic.<\/span><\/strong><\/li>\n<\/ul>\n<p><strong>Commonwealth Avenue<\/strong><\/p>\n<ul>\n<li>Crews will be constructing a temporary enclosure on Commonwealth Avenue&#8217;s sidewalk.<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline;\"><strong>Interior Work<\/strong><\/span><\/p>\n<p><b>Tower A<\/b><\/p>\n<ul>\n<li>Rough-in of HVAC piping, electrical, fire alarm, plumbing, and sheet metal ductwork continues.<\/li>\n<li>Pressure testing of mechanical piping and sheet metal ductwork continues.<\/li>\n<li>Steel stud framing of interior partitions and soffits continues.<\/li>\n<li>Installation of hollow metal door frames continues.<\/li>\n<li>Application of spray fireproofing, expanding foam insulation, and firestopping continues.<\/li>\n<li>New window installation continues.<\/li>\n<li>Drywall installation and taping continues.<\/li>\n<li>Plaster patching at columns and beams continues.<\/li>\n<li>Stair handrail and riser alterations are ongoing.<\/li>\n<li>Priming and painting of walls, ceilings, soffits, doors, and door frames continues.<\/li>\n<li>Floor and wall preparation and waterproofing is ongoing in the core bathrooms.<\/li>\n<\/ul>\n<figure id=\"attachment27123\" aria-describedby=\"caption-attachment27123\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2026\/02\/Ceramic-tile-in-ADA-bathrooms-477x636.jpg\" alt=\"\" width=\"500\" height=\"667\" class=\"wp-image-27123\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Ceramic-tile-in-ADA-bathrooms-477x636.jpg 477w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Ceramic-tile-in-ADA-bathrooms-768x1024.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Ceramic-tile-in-ADA-bathrooms-1152x1536.jpg 1152w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Ceramic-tile-in-ADA-bathrooms-1536x2048.jpg 1536w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><figcaption id=\"caption-attachment27123\" class=\"wp-caption-text\">Pictured is the ceramic tile in the ADA bathrooms.<\/figcaption><\/figure>\n<ul>\n<li>Installing flooring and bases in student dorm rooms.<\/li>\n<\/ul>\n<figure id=\"attachment27118\" aria-describedby=\"caption-attachment27118\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2026\/02\/Student-room-flooring-and-base-477x636.jpg\" alt=\"\" width=\"500\" height=\"667\" class=\"wp-image-27118\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Student-room-flooring-and-base-477x636.jpg 477w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Student-room-flooring-and-base-768x1024.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Student-room-flooring-and-base-1152x1536.jpg 1152w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Student-room-flooring-and-base-1536x2048.jpg 1536w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><figcaption id=\"caption-attachment27118\" class=\"wp-caption-text\">Pictured is the student room flooring and base.<\/figcaption><\/figure>\n<ul>\n<li>Modernization of the Tower elevators by Otis Elevator Company continues.<\/li>\n<\/ul>\n<ul><\/ul>\n<ul><\/ul>\n<ul><\/ul>\n<p><b>Parking Garage\u00a0<\/b><\/p>\n<ul>\n<li>Electricians continue running wiring, conduits, and electrical gear throughout Levels 1\u20133.<\/li>\n<\/ul>\n<figure id=\"attachment27117\" aria-describedby=\"caption-attachment27117\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2026\/02\/Tower-A-B-C-Emergency-Generator-Transfer-Switches-477x636.jpg\" alt=\"\" width=\"500\" height=\"667\" class=\"wp-image-27117\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-A-B-C-Emergency-Generator-Transfer-Switches-477x636.jpg 477w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-A-B-C-Emergency-Generator-Transfer-Switches-768x1024.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-A-B-C-Emergency-Generator-Transfer-Switches-1152x1536.jpg 1152w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-A-B-C-Emergency-Generator-Transfer-Switches-1536x2048.jpg 1536w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><figcaption id=\"caption-attachment27117\" class=\"wp-caption-text\">Pictured is the Towers emergency generator transfer switches.<\/figcaption><\/figure>\n<ul>\n<li>Plumbers continue installing new water and drain lines in the basement and Levels 1\u20133.<\/li>\n<li>Concrete and steel structural repairs continue on Levels 1\u20133.<\/li>\n<li>Sprinkler work continues on basement and Levels 1\u20133.<\/li>\n<li>Masons continue installing block walls in the new mechanical and electrical rooms.<\/li>\n<li><strong>Please watch for adjusted parking patterns, cones, and observe signage.<\/strong><\/li>\n<\/ul>\n<ul><\/ul>\n<ul><\/ul>\n<ul><\/ul>\n<h2 style=\"text-align: center;\"><b>During the week of 2\/23<\/b><\/h2>\n<h3 style=\"text-align: center;\"><b>\u00a0Crews working 1st &amp; 2nd shifts<\/b><\/h3>\n<p><span style=\"text-decoration: underline;\"><strong>Exterior Work<\/strong><\/span><\/p>\n<p><b>Tower A<\/b><\/p>\n<p><b>4th Floor Podium Roofs<\/b><\/p>\n<ul>\n<li>Low roofs will be used as laydown areas for tools, supplies, materials, and temporary heating units.<\/li>\n<\/ul>\n<p><b>East &amp; West Facades<\/b><\/p>\n<ul>\n<li>Crews will be working on the low roofs east and west of Tower A.<\/li>\n<li>Masons will continue exterior brick veneer restoration work, including selective demolition and installation of restoration anchors, air-, water-, and vapor-barrier systems, new lintels, flashings, and relieving angles.<\/li>\n<li>Installation of new windows and metal panels continues.<\/li>\n<\/ul>\n<p><b>Front Fa\u00e7ade and on Commonwealth Ave.<\/b><\/p>\n<ul>\n<li>Masons will continue exterior brick veneer restoration work, including selective demolition and installation of restoration anchors, air-, water-, and vapor-barrier systems, new lintels, flashings, and relieving angles.<\/li>\n<li>Installation of new windows and metal panels continues.<\/li>\n<\/ul>\n<p><b>Rear Fa\u00e7ade and Back Alley<\/b><\/p>\n<ul>\n<li>Masons will continue exterior brick veneer restoration work, including selective demolition and installation of restoration anchors, air-, water-, and vapor-barrier systems, new lintels, flashings, and relieving angles.<\/li>\n<li>Installation of new windows and metal panels continues.<\/li>\n<\/ul>\n<p><b>Upper Roof<\/b><\/p>\n<ul>\n<li>Work continues constructing the mechanical penthouse and emergency electric room.<\/li>\n<li>Assembly and installation of DOAS units, piping, sheet metal ductwork, and electrical connections continue.<\/li>\n<li>Installation work on the emergency generator continues.<\/li>\n<li>Installation of metal panel roof screen begins.<\/li>\n<\/ul>\n<ul><\/ul>\n<p><b>Tower B<\/b><\/p>\n<p><strong>North, south, east, and west facades<\/strong><\/p>\n<figure id=\"attachment27114\" aria-describedby=\"caption-attachment27114\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2026\/02\/Tower-B-hoist-Way-Bridge-1-477x636.jpg\" alt=\"\" width=\"500\" height=\"667\" class=\"wp-image-27114\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-B-hoist-Way-Bridge-1-477x636.jpg 477w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-B-hoist-Way-Bridge-1-768x1024.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-B-hoist-Way-Bridge-1-1152x1536.jpg 1152w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Tower-B-hoist-Way-Bridge-1-1536x2048.jpg 1536w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><figcaption id=\"caption-attachment27114\" class=\"wp-caption-text\">Pictured is the Tower B hoist way and bridge.<\/figcaption><\/figure>\n<ul>\n<li>Scaffolding installation continues on all fa\u00e7ades. The crews will be working on levels 5-14 next week.<\/li>\n<\/ul>\n<p><b>West Podium Terrace<\/b><\/p>\n<ul>\n<li>Assembly and installation of heat pumps and condensers continue.<\/li>\n<li>Carpenters will be working on the roof screen assembly.<\/li>\n<\/ul>\n<figure id=\"attachment27110\" aria-describedby=\"caption-attachment27110\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2026\/02\/West-Terrace-Roof-Screen-636x477.jpg\" alt=\"\" width=\"500\" height=\"375\" class=\"wp-image-27110\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/West-Terrace-Roof-Screen-636x477.jpg 636w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/West-Terrace-Roof-Screen-1024x768.jpg 1024w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/West-Terrace-Roof-Screen-768x576.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/West-Terrace-Roof-Screen-1536x1152.jpg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/West-Terrace-Roof-Screen-2048x1536.jpg 2048w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><figcaption id=\"caption-attachment27110\" class=\"wp-caption-text\">Pictured is the west terrace roof screen.<\/figcaption><\/figure>\n<ul><\/ul>\n<p><b>Multipurpose Room Roof (Podium D)<\/b><\/p>\n<ul>\n<li>Work continues constructing the new boiler room.<\/li>\n<\/ul>\n<p><b>Cummington Mall<\/b><br \/>\n<i>(In and around the fenced area)<\/i><\/p>\n<ul>\n<li>Daily deliveries of tools, supplies, and materials will continue.<\/li>\n<li>Two-car personnel and materials hoist way remains in operation.\n<ul>\n<li>(Elevator operators begin daily safety checks and preventative maintenance at 6:00 a.m.)<\/li>\n<\/ul>\n<\/li>\n<li>Temporary elevator hoist way and bridge beam assembly for Tower B continues and impacts two entry\/exit doors at 111 Cummington Mall.<\/li>\n<\/ul>\n<ul><\/ul>\n<p><b>Cummington Mall West \/ Hinsdale Mall<\/b><\/p>\n<ul>\n<li>BUPD detail officers and construction staff will be on-site.<\/li>\n<\/ul>\n<p><strong>Commonwealth Avenue<\/strong><\/p>\n<ul>\n<li>Crews are cutting in a new door opening into the fire pump room from a temporary enclosure on the Commonwealth Avenue sidewalk.<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline;\"><strong>Interior Work<\/strong><\/span><\/p>\n<p><b>Tower A<\/b><\/p>\n<ul>\n<li>Rough-in of HVAC piping, electrical, fire alarm, plumbing and sheet metal ductwork is ongoing.<\/li>\n<li>Pressure testing of mechanical piping and sheet metal ductwork continues.<\/li>\n<li>Steel stud framing of interior partitions and soffits continues.<\/li>\n<li>Installation of hollow metal door frames continues.<\/li>\n<li>Fireproofing and firestopping continues.<\/li>\n<li>New window installation continues.<\/li>\n<li>Drywall installation and taping continue.<\/li>\n<li>Plaster patching continues.<\/li>\n<li>Stair handrail and riser alterations continue.<\/li>\n<li>Priming and painting of walls, ceilings, soffits, doors, and door frames continues.<\/li>\n<li>Floor preparations, waterproofing, and tile installation is ongoing in the core bathrooms.<\/li>\n<\/ul>\n<figure id=\"attachment27122\" aria-describedby=\"caption-attachment27122\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2026\/02\/Ceramic-Tile-in-bathroom-coridoor-477x636.jpg\" alt=\"\" width=\"500\" height=\"667\" class=\"wp-image-27122\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Ceramic-Tile-in-bathroom-coridoor-477x636.jpg 477w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Ceramic-Tile-in-bathroom-coridoor-768x1024.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Ceramic-Tile-in-bathroom-coridoor-1152x1536.jpg 1152w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Ceramic-Tile-in-bathroom-coridoor-1536x2048.jpg 1536w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><figcaption id=\"caption-attachment27122\" class=\"wp-caption-text\">Pictured is the ceramic tile in the bathroom corridor.<\/figcaption><\/figure>\n<ul><\/ul>\n<ul><\/ul>\n<ul>\n<li>Floor preparation and underlayment installation in begins in the student dorm rooms.<\/li>\n<li>Installation of doors and hardware begins.<\/li>\n<\/ul>\n<figure id=\"attachment27120\" aria-describedby=\"caption-attachment27120\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2026\/02\/Interior-doors-protected-during-construction-477x636.jpg\" alt=\"\" width=\"500\" height=\"667\" class=\"wp-image-27120\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Interior-doors-protected-during-construction-477x636.jpg 477w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Interior-doors-protected-during-construction-768x1024.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Interior-doors-protected-during-construction-1152x1536.jpg 1152w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Interior-doors-protected-during-construction-1536x2048.jpg 1536w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><figcaption id=\"caption-attachment27120\" class=\"wp-caption-text\">Pictured is the interior doors being protected during construction.<\/figcaption><\/figure>\n<ul>\n<li>Otis elevator modernization continues.<\/li>\n<li>Third-party inspectors remain onsite as needed.<\/li>\n<\/ul>\n<ul><\/ul>\n<ul><\/ul>\n<p><b>Parking Garage<\/b><\/p>\n<ul>\n<li>Work continues in the main electrical room.<\/li>\n<li>Electricians will continue running wiring and conduits throughout the parking garage on levels 1-3.<\/li>\n<li>Installation of electrical gear continues.<\/li>\n<li>Plumbers will continue installing new water and drain lines in the basement and levels 1-3.<\/li>\n<\/ul>\n<figure id=\"attachment27121\" aria-describedby=\"caption-attachment27121\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2026\/02\/Hot-Water-Heaters-1-636x477.jpg\" alt=\"\" width=\"500\" height=\"375\" class=\"wp-image-27121\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Hot-Water-Heaters-1-636x477.jpg 636w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Hot-Water-Heaters-1-1024x768.jpg 1024w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Hot-Water-Heaters-1-768x576.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Hot-Water-Heaters-1-1536x1152.jpg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/Hot-Water-Heaters-1-2048x1536.jpg 2048w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><figcaption id=\"caption-attachment27121\" class=\"wp-caption-text\">Pictured are the hot water heaters.<\/figcaption><\/figure>\n<ul>\n<li>Mechanical piping installation continues.<\/li>\n<li>Parking &amp; Transportation office construction continues.<\/li>\n<li>Fuel storage room construction continues.<\/li>\n<li>Concrete and steel structural repair work continues on levels 1-3.<\/li>\n<li>Work on sprinklers continues.<\/li>\n<li>Masons will continue installing block walls in the new mechanical and electric rooms.<\/li>\n<\/ul>\n<figure id=\"attachment27119\" aria-describedby=\"caption-attachment27119\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2026\/02\/New-MDF-Room-636x477.jpg\" alt=\"\" width=\"500\" height=\"375\" class=\"wp-image-27119\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/New-MDF-Room-636x477.jpg 636w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/New-MDF-Room-1024x768.jpg 1024w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/New-MDF-Room-768x576.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/New-MDF-Room-1536x1152.jpg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2026\/02\/New-MDF-Room-2048x1536.jpg 2048w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><figcaption id=\"caption-attachment27119\" class=\"wp-caption-text\">Pictured is the new MDF room.<\/figcaption><\/figure>\n<ul>\n<li>Temporary heaters remain in operation on Level 3.<\/li>\n<li><strong>Please watch for adjusted parking patterns, BUPD detail officers, cones, and observe signage.<\/strong><\/li>\n<\/ul>\n<ul><\/ul>\n<ul><\/ul>\n<ul><\/ul>\n<ul><\/ul>\n<h3 style=\"text-align: center;\"><b>Future \/ Notable Tasks<\/b><\/h3>\n<ul>\n<li>Window leak testing on Tower A continues.<\/li>\n<li>FM global roof uplift testing continues.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>General Project Information Weekday shifts run from 7:00 a.m. to 3:30 p.m. (1st shift), 9:00 a.m. to 5:00 p.m. (1st [&hellip;]<\/p>\n","protected":false},"author":25720,"featured_media":27113,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4079,736,1],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/27124"}],"collection":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/users\/25720"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/comments?post=27124"}],"version-history":[{"count":4,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/27124\/revisions"}],"predecessor-version":[{"id":27166,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/27124\/revisions\/27166"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media\/27113"}],"wp:attachment":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media?parent=27124"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/categories?post=27124"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/tags?post=27124"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}