{"id":23849,"date":"2022-05-06T13:04:39","date_gmt":"2022-05-06T17:04:39","guid":{"rendered":"https:\/\/www.bu.edu\/cpo\/?p=23849"},"modified":"2023-03-29T14:57:38","modified_gmt":"2023-03-29T18:57:38","slug":"center-for-computing-data-sciences-construction-update-05-06-22","status":"publish","type":"post","link":"https:\/\/www.bu.edu\/cpo\/2022\/05\/06\/center-for-computing-data-sciences-construction-update-05-06-22\/","title":{"rendered":"Center for Computing &#038; Data Sciences &#8211; Construction Update &#8211; 05\/06\/22"},"content":{"rendered":"<h2 style=\"text-align: center;\">During the weekend of May 7th<\/h2>\n<ul>\n<li>On Saturday, installation of the atrium\u2019s monumental stair will continue. Framing, hanging, and finishing drywall will continue in the tower. Crews will also be on site assembling and installing curtain wall panels. Workers will continue applying fire proofing materials to the buildings steel beams and columns. Crews from the mechanical and electrical subcontractors will be on site continuing the install of their respective systems.<\/li>\n<\/ul>\n<figure id=\"attachment23850\" aria-describedby=\"caption-attachment23850\" style=\"width: 487px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2022\/05\/Installing-horizontal-piping-connecting-geothermal-wells-to-the-buildings-systems-477x636.jpg\" alt=\"\" width=\"477\" height=\"636\" class=\"wp-image-23850 size-medium\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2022\/05\/Installing-horizontal-piping-connecting-geothermal-wells-to-the-buildings-systems-477x636.jpg 477w, https:\/\/www.bu.edu\/cpo\/files\/2022\/05\/Installing-horizontal-piping-connecting-geothermal-wells-to-the-buildings-systems-768x1024.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2022\/05\/Installing-horizontal-piping-connecting-geothermal-wells-to-the-buildings-systems-1152x1536.jpg 1152w, https:\/\/www.bu.edu\/cpo\/files\/2022\/05\/Installing-horizontal-piping-connecting-geothermal-wells-to-the-buildings-systems-rotated.jpg 1512w\" sizes=\"(max-width: 477px) 100vw, 477px\" \/><figcaption id=\"caption-attachment23850\" class=\"wp-caption-text\">Installing horizontal piping connecting geothermal wells to the building&#8217;s systems.<\/figcaption><\/figure>\n<h2 style=\"text-align: center;\"><strong>During the week of May 9th<\/strong><\/h2>\n<ul>\n<li>Installation of curtain wall panels at the various leave-out locations throughout the tower.<\/li>\n<li>At the atrium, crews continue to install the monumental stair. Focus this week is on the section connecting the ground to the second floor and securing it to the building\u2019s structure. Crews will also continue installing rails on the stair runs.<\/li>\n<li>In the podium, finishes are underway. The folding partition will be installed dividing two of the lower-level classrooms. Installation of the whiteboards in the classrooms continues. Installation of lockers will begin on the lower level, millwork install will continue throughout. Painting and ceiling install will continue floors 4 and 5.<\/li>\n<li>In the tower, finishes are also underway on the lower floors with floor polishing, ceiling installation, millwork install, and wall painting occurring.<\/li>\n<li>On the 11th through 16th floors of the tower wall framing, hanging drywall, and finishing walls are underway.<\/li>\n<li>The elevator subcontractor will continue the installation of elevators 1, 2, and 3 on the north side of the towers\u2019 core, involving raceways and elevator rail components.<\/li>\n<li>Installation of the roofing system at the terraces will continue with the focus being on the 12th and 15th floor terraces.<\/li>\n<li>At the soffits on the underside of the 12th and 15th floors, installation of waterproofing and framing components continues.<\/li>\n<li>At the corner of Bay State Road and Granby Street, crews will be completing installation of infrastructure for the storm drainage and geothermal systems. Crews will begin backfilling this area and begin installing foundations for landscape features.<\/li>\n<li>Trucking activity to and from the site will be occurring daily with trucks entering and exiting the designated gates.<\/li>\n<\/ul>\n<figure id=\"attachment23851\" aria-describedby=\"caption-attachment23851\" style=\"width: 499px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2022\/05\/Welding-sections-of-the-Atrium-Stair-together-489x636.jpeg\" alt=\"\" width=\"489\" height=\"636\" class=\"size-medium wp-image-23851\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2022\/05\/Welding-sections-of-the-Atrium-Stair-together-489x636.jpeg 489w, https:\/\/www.bu.edu\/cpo\/files\/2022\/05\/Welding-sections-of-the-Atrium-Stair-together-788x1024.jpeg 788w, https:\/\/www.bu.edu\/cpo\/files\/2022\/05\/Welding-sections-of-the-Atrium-Stair-together-768x998.jpeg 768w, https:\/\/www.bu.edu\/cpo\/files\/2022\/05\/Welding-sections-of-the-Atrium-Stair-together-1182x1536.jpeg 1182w, https:\/\/www.bu.edu\/cpo\/files\/2022\/05\/Welding-sections-of-the-Atrium-Stair-together-1576x2048.jpeg 1576w, https:\/\/www.bu.edu\/cpo\/files\/2022\/05\/Welding-sections-of-the-Atrium-Stair-together-scaled.jpeg 1970w\" sizes=\"(max-width: 489px) 100vw, 489px\" \/><figcaption id=\"caption-attachment23851\" class=\"wp-caption-text\">Welding sections of the atrium stair together.<\/figcaption><\/figure>\n<h2 style=\"text-align: center;\"><strong>Tower crane removal is scheduled for May 14 \u2013 May 20<\/strong><\/h2>\n<ul>\n<li>For additional information on the upcoming activity, please visit <a data-cke-saved-href=\"https:\/\/mcusercontent.com\/fb89f97f346ea0a3cf1abcfae\/files\/0ae9a172-25ac-5cba-d75f-9779e3e8768d\/Final_crane_dismantle_narrative_and_plan_2020_05_14_compressed.pdf\" href=\"https:\/\/mcusercontent.com\/fb89f97f346ea0a3cf1abcfae\/files\/0ae9a172-25ac-5cba-d75f-9779e3e8768d\/Final_crane_dismantle_narrative_and_plan_2020_05_14_compressed.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Final Crane Dismantle Narrative and Plan<\/a>.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>During the weekend of May 7th On Saturday, installation of the atrium\u2019s monumental stair will continue. Framing, hanging, and finishing [&hellip;]<\/p>\n","protected":false},"author":20237,"featured_media":23851,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4079,736],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/23849"}],"collection":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/users\/20237"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/comments?post=23849"}],"version-history":[{"count":1,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/23849\/revisions"}],"predecessor-version":[{"id":23852,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/23849\/revisions\/23852"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media\/23851"}],"wp:attachment":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media?parent=23849"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/categories?post=23849"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/tags?post=23849"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}