{"id":23707,"date":"2022-02-11T10:12:46","date_gmt":"2022-02-11T14:12:46","guid":{"rendered":"https:\/\/www.bu.edu\/cpo\/?p=23707"},"modified":"2023-04-05T14:09:56","modified_gmt":"2023-04-05T18:09:56","slug":"center-for-computing-data-sciences-construction-update-02-11-22","status":"publish","type":"post","link":"https:\/\/www.bu.edu\/cpo\/2022\/02\/11\/center-for-computing-data-sciences-construction-update-02-11-22\/","title":{"rendered":"Center for Computing &#038; Data Sciences &#8211; Construction Update &#8211; 02\/11\/22"},"content":{"rendered":"<h2 style=\"text-align: center;\">During the weekend of February 12th<\/h2>\n<ul>\n<li>On Saturday, crews will be on site to continue buildout of elevators 4, 5, and 6 in the tower&#8217;s core. Installation of fire protection rough, and the atrium&#8217;s monumental stair will continue, along with spraying the fireproofing and intumescent coatings to the building&#8217;s steel columns and beams. Crews will also be on site assembling and installing curtain wall panels.<\/li>\n<\/ul>\n<figure id=\"attachment23709\" aria-describedby=\"caption-attachment23709\" style=\"width: 487px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2022\/02\/Installing-roofing-material-at-the-6th-floor-terrace-477x636.jpeg\" alt=\"\" width=\"477\" height=\"636\" class=\"wp-image-23709 size-medium\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2022\/02\/Installing-roofing-material-at-the-6th-floor-terrace-477x636.jpeg 477w, https:\/\/www.bu.edu\/cpo\/files\/2022\/02\/Installing-roofing-material-at-the-6th-floor-terrace-768x1024.jpeg 768w, https:\/\/www.bu.edu\/cpo\/files\/2022\/02\/Installing-roofing-material-at-the-6th-floor-terrace-1152x1536.jpeg 1152w, https:\/\/www.bu.edu\/cpo\/files\/2022\/02\/Installing-roofing-material-at-the-6th-floor-terrace-1536x2048.jpeg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2022\/02\/Installing-roofing-material-at-the-6th-floor-terrace-scaled.jpeg 1920w\" sizes=\"(max-width: 477px) 100vw, 477px\" \/><figcaption id=\"caption-attachment23709\" class=\"wp-caption-text\">Installing roofing material at the 6th-floor terrace.<\/figcaption><\/figure>\n<h2 style=\"text-align: center;\"><strong>During the week of <\/strong><strong>February 14th<\/strong><\/h2>\n<ul>\n<li>Installation of curtain wall panels at the tower will continue on the 11th and 12th floors. Delivery and assembly of the panels before installation will continue on the floors above.<\/li>\n<li>In the subbasement and lower level, wall finishing is ongoing while crews from the mechanical, electrical, and plumbing (MEP) subcontractors will continue installing their respective systems.<\/li>\n<li>On floors 2 through 7 of the tower, wall framing, overhead MEP rough install continues. Hanging and finishing drywall will follow behind.<\/li>\n<li>On floors 8 through 17 of the tower, the MEP subcontractors will continue with system rough-in, installing electrical conduit, hangers, and piping. Wall framing will occur in select areas.<\/li>\n<li>In the mechanical spaces on the 18th and 19th floors, crews will continue installing piping, ductwork, conduit, and wires to the mechanical equipment.<\/li>\n<li>On the 7th and 8th floors, crews will be applying an intumescent coating to the steel columns.<\/li>\n<li>Installation of the atrium\u2019s monumental stairs will continue;\u00a0this week\u2019s focus will be on the section connecting the lower level and ground floor.<\/li>\n<li>The elevator subcontractor will begin making final adjustments at elevators 4, 5, and 6 in the tower while continuing the buildout of the shafts for elevators 7 and 8 in the podium.<\/li>\n<li>Installation of the roofing system at the podium will continue as weather allows.<\/li>\n<li>Within the alleyway, the site contractor will continue trenching and install piping to connect the individual geothermal well circuits before connecting to the building.<\/li>\n<li>Trucking activity to and from the site will be occurring daily with trucks entering and exiting the designated gates.<\/li>\n<\/ul>\n<figure id=\"attachment23708\" aria-describedby=\"caption-attachment23708\" style=\"width: 487px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2022\/02\/Installing-above-ceiling-ductwork-and-piping-on-the-towers-7th-floor-477x636.jpeg\" alt=\"\" width=\"477\" height=\"636\" class=\"wp-image-23708 size-medium\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2022\/02\/Installing-above-ceiling-ductwork-and-piping-on-the-towers-7th-floor-477x636.jpeg 477w, https:\/\/www.bu.edu\/cpo\/files\/2022\/02\/Installing-above-ceiling-ductwork-and-piping-on-the-towers-7th-floor-768x1024.jpeg 768w, https:\/\/www.bu.edu\/cpo\/files\/2022\/02\/Installing-above-ceiling-ductwork-and-piping-on-the-towers-7th-floor-1152x1536.jpeg 1152w, https:\/\/www.bu.edu\/cpo\/files\/2022\/02\/Installing-above-ceiling-ductwork-and-piping-on-the-towers-7th-floor-1536x2048.jpeg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2022\/02\/Installing-above-ceiling-ductwork-and-piping-on-the-towers-7th-floor-scaled.jpeg 1920w\" sizes=\"(max-width: 477px) 100vw, 477px\" \/><figcaption id=\"caption-attachment23708\" class=\"wp-caption-text\">Installing above-ceiling ductwork and piping on the tower&#8217;s 7th floor.<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>During the weekend of February 12th On Saturday, crews will be on site to continue buildout of elevators 4, 5, [&hellip;]<\/p>\n","protected":false},"author":20237,"featured_media":23709,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4079,736],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/23707"}],"collection":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/users\/20237"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/comments?post=23707"}],"version-history":[{"count":1,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/23707\/revisions"}],"predecessor-version":[{"id":23710,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/23707\/revisions\/23710"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media\/23709"}],"wp:attachment":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media?parent=23707"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/categories?post=23707"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/tags?post=23707"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}