{"id":23690,"date":"2022-01-28T10:05:55","date_gmt":"2022-01-28T14:05:55","guid":{"rendered":"https:\/\/www.bu.edu\/cpo\/?p=23690"},"modified":"2023-04-05T14:10:07","modified_gmt":"2023-04-05T18:10:07","slug":"center-for-computing-data-sciences-construction-update-1-28-22","status":"publish","type":"post","link":"https:\/\/www.bu.edu\/cpo\/2022\/01\/28\/center-for-computing-data-sciences-construction-update-1-28-22\/","title":{"rendered":"Center for Computing &#038; Data Sciences \u2013 Construction Update \u2013 1\/28\/22"},"content":{"rendered":"<h2 style=\"text-align: center;\">During the weekend of January 29th<\/h2>\n<ul>\n<li>Due to the winter storm forecasted for Saturday, the only activities on site this weekend will be storm cleanup.<\/li>\n<\/ul>\n<figure id=\"attachment23691\" aria-describedby=\"caption-attachment23691\" style=\"width: 487px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2022\/01\/Buildout-of-the-18th-floor-mechanical-space-477x636.jpeg\" alt=\"Buildout of the 18th floor mechanical space\" width=\"477\" height=\"636\" class=\"size-medium wp-image-23691\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2022\/01\/Buildout-of-the-18th-floor-mechanical-space-477x636.jpeg 477w, https:\/\/www.bu.edu\/cpo\/files\/2022\/01\/Buildout-of-the-18th-floor-mechanical-space-768x1024.jpeg 768w, https:\/\/www.bu.edu\/cpo\/files\/2022\/01\/Buildout-of-the-18th-floor-mechanical-space-1152x1536.jpeg 1152w, https:\/\/www.bu.edu\/cpo\/files\/2022\/01\/Buildout-of-the-18th-floor-mechanical-space-1536x2048.jpeg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2022\/01\/Buildout-of-the-18th-floor-mechanical-space-scaled.jpeg 1920w\" sizes=\"(max-width: 477px) 100vw, 477px\" \/><figcaption id=\"caption-attachment23691\" class=\"wp-caption-text\">Buildout of the 18th -floor mechanical space<\/figcaption><\/figure>\n<h2 style=\"text-align: center;\"><strong>During the week of January 31st<\/strong><\/h2>\n<ul>\n<li>Installation of curtain wall panels at the tower will continue on the 8th and 9th floors. Delivery and assembly of the panels before installation will continue on the floors above.<\/li>\n<li>In the subbasement and lower level, wall finishing is ongoing while crews from the mechanical, electrical, and plumbing (MEP) subcontractors will continue installing their respective systems.<\/li>\n<li>On floors 2 through 6, wall framing, overhead MEP rough install continues, as well as hanging drywall.<\/li>\n<li>On floors 7 through 17 of the tower, the MEP subcontractors will continue installing electrical conduit, hangers, and piping. Wall framing will occur in select areas.<span style=\"text-decoration: line-through;\"><\/span><\/li>\n<li>Installation of the atrium\u2019s monumental stair will continue.<\/li>\n<li>The elevator subcontractor will continue installing cab shells and wiring for elevators 4, 5, and 6 and will begin to mobilize equipment for podium elevators 7 and 8.<\/li>\n<li>Installation of the roofing system at the podium will continue as weather allows.<\/li>\n<li>In the mechanical spaces on the 18th and 19th floors, crews will continue installing piping, ductwork, conduit, and wires to the mechanical equipment.<\/li>\n<li>Within the alleyway, the site contractor will continue trenching and will install piping to connect the individual geothermal well circuits before connecting to the building.<\/li>\n<li>Trucking activity to and from the site will be occurring daily with trucks entering and exiting the designated gates.<\/li>\n<\/ul>\n<figure id=\"attachment23692\" aria-describedby=\"caption-attachment23692\" style=\"width: 487px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2022\/01\/Laying-pipe-in-trenches-connecting-the-geothermal-wells-to-the-building-477x636.jpeg\" alt=\"\" width=\"477\" height=\"636\" class=\"size-medium wp-image-23692\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2022\/01\/Laying-pipe-in-trenches-connecting-the-geothermal-wells-to-the-building-477x636.jpeg 477w, https:\/\/www.bu.edu\/cpo\/files\/2022\/01\/Laying-pipe-in-trenches-connecting-the-geothermal-wells-to-the-building-768x1024.jpeg 768w, https:\/\/www.bu.edu\/cpo\/files\/2022\/01\/Laying-pipe-in-trenches-connecting-the-geothermal-wells-to-the-building-1152x1536.jpeg 1152w, https:\/\/www.bu.edu\/cpo\/files\/2022\/01\/Laying-pipe-in-trenches-connecting-the-geothermal-wells-to-the-building-1536x2048.jpeg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2022\/01\/Laying-pipe-in-trenches-connecting-the-geothermal-wells-to-the-building-scaled.jpeg 1920w\" sizes=\"(max-width: 477px) 100vw, 477px\" \/><figcaption id=\"caption-attachment23692\" class=\"wp-caption-text\">Laying pipe in trenches connecting the geothermal wells to the building<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>During the weekend of January 29th Due to the winter storm forecasted for Saturday, the only activities on site this [&hellip;]<\/p>\n","protected":false},"author":20237,"featured_media":23692,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4079,736],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/23690"}],"collection":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/users\/20237"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/comments?post=23690"}],"version-history":[{"count":2,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/23690\/revisions"}],"predecessor-version":[{"id":23694,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/23690\/revisions\/23694"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media\/23692"}],"wp:attachment":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media?parent=23690"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/categories?post=23690"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/tags?post=23690"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}