{"id":22889,"date":"2021-05-21T15:14:21","date_gmt":"2021-05-21T19:14:21","guid":{"rendered":"https:\/\/www.bu.edu\/cpo\/?p=22889"},"modified":"2023-04-05T14:18:03","modified_gmt":"2023-04-05T18:18:03","slug":"center-for-computing-data-sciences-construction-update-5-21-21","status":"publish","type":"post","link":"https:\/\/www.bu.edu\/cpo\/2021\/05\/21\/center-for-computing-data-sciences-construction-update-5-21-21\/","title":{"rendered":"Center for Computing &#038; Data Sciences \u2013 Construction Update \u2013 5\/21\/21"},"content":{"rendered":"<figure id=\"attachment22904\" aria-describedby=\"caption-attachment22904\" style=\"width: 565px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" src=\"\/cpo\/files\/2021\/05\/Installation-of-underground-piping-ongoing-636x477.jpg\" alt=\"Ongoing installation of underground piping\" width=\"555\" height=\"415\" class=\" wp-image-22904\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2021\/05\/Installation-of-underground-piping-ongoing-636x477.jpg 636w, https:\/\/www.bu.edu\/cpo\/files\/2021\/05\/Installation-of-underground-piping-ongoing-1024x768.jpg 1024w, https:\/\/www.bu.edu\/cpo\/files\/2021\/05\/Installation-of-underground-piping-ongoing-768x576.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2021\/05\/Installation-of-underground-piping-ongoing-1536x1152.jpg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2021\/05\/Installation-of-underground-piping-ongoing-2048x1536.jpg 2048w\" sizes=\"(max-width: 555px) 100vw, 555px\" \/><figcaption id=\"caption-attachment22904\" class=\"wp-caption-text\">Ongoing installation of underground piping<\/figcaption><\/figure>\n<h2 style=\"background-color: #404956; color: white; padding: 10px; text-align: center;\">During the weekend of May 22<sup>nd<\/sup><\/h2>\n<ul>\n<li><span>On Saturday crews will be on site installing anchor bolts into concrete pier foundations by drilling and epoxying anchor bolts into the concrete piers.<\/span><\/li>\n<\/ul>\n<h2 style=\"background-color: #404956; color: white; padding: 10px; text-align: center;\">During the weekend of May 24<sup>th<\/sup><\/h2>\n<ul>\n<li><span>Last Friday (5\/14) an incident occurred during steel erection. This activity has temporarily paused while the project team evaluates resuming erection. Detailing within the tower\u2019s core and selective areas of decking will continue.<\/span><\/li>\n<li><span>In the tower\u2019s subbasement, work is ongoing for the plumbing piping systems.<\/span><\/li>\n<li><span>Also in the subbasement, the mechanical subcontractor will be installing air handling units and <span style=\"caret-color: #ff6600;\">begin<\/span> installing associated piping and ductwork.<\/span><\/li>\n<li><span>Behind Sargent College, trenching is underway to install the\u00a0piping circuit for the geothermal wells #11, #12, and #13 to each other and back to the systems manifold in the basement. Following the completion of the geothermal work, the accessible pathway to the Sargent College entrance will be restored to its existing condition. Please be aware of all directional and parking signage in the area.<\/span><\/li>\n<li><span>Deliveries to and from the site will be occurring daily with trucks entering and exiting the designated gates.<\/span><\/li>\n<li><span>Please be aware of all directional signage, as pedestrian travel paths may be altered. We will continue to provide you with up-to-date information via these notifications.<\/span><\/li>\n<\/ul>\n<figure id=\"attachment22905\" aria-describedby=\"caption-attachment22905\" style=\"width: 566px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" src=\"\/cpo\/files\/2021\/05\/Installing-air-handling-units-636x477.jpeg\" alt=\"Installing air handling units\" width=\"556\" height=\"416\" class=\" wp-image-22905\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2021\/05\/Installing-air-handling-units-636x477.jpeg 636w, https:\/\/www.bu.edu\/cpo\/files\/2021\/05\/Installing-air-handling-units-1024x768.jpeg 1024w, https:\/\/www.bu.edu\/cpo\/files\/2021\/05\/Installing-air-handling-units-768x576.jpeg 768w, https:\/\/www.bu.edu\/cpo\/files\/2021\/05\/Installing-air-handling-units-1536x1152.jpeg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2021\/05\/Installing-air-handling-units-2048x1536.jpeg 2048w\" sizes=\"(max-width: 556px) 100vw, 556px\" \/><figcaption id=\"caption-attachment22905\" class=\"wp-caption-text\">Installing air handling units<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>During the weekend of May 22nd On Saturday crews will be on site installing anchor bolts into concrete pier foundations [&hellip;]<\/p>\n","protected":false},"author":19041,"featured_media":22905,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4079,736],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/22889"}],"collection":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/users\/19041"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/comments?post=22889"}],"version-history":[{"count":6,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/22889\/revisions"}],"predecessor-version":[{"id":22921,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/22889\/revisions\/22921"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media\/22905"}],"wp:attachment":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media?parent=22889"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/categories?post=22889"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/tags?post=22889"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}