{"id":22557,"date":"2021-03-26T08:10:18","date_gmt":"2021-03-26T12:10:18","guid":{"rendered":"https:\/\/www.bu.edu\/cpo\/?p=22557"},"modified":"2023-04-05T14:19:19","modified_gmt":"2023-04-05T18:19:19","slug":"center-for-computing-data-sciences-construction-update-3-26-21-draft","status":"publish","type":"post","link":"https:\/\/www.bu.edu\/cpo\/2021\/03\/26\/center-for-computing-data-sciences-construction-update-3-26-21-draft\/","title":{"rendered":"Center for Computing &#038; Data Sciences \u2013 Construction Update \u2013 3\/26\/21"},"content":{"rendered":"<figure id=\"attachment22575\" aria-describedby=\"caption-attachment22575\" style=\"width: 646px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2021\/03\/Concrete-topping-slab-poured-for-the-north-half-of-the-podium\u2019s-basement-636x477.jpg\" alt=\"Concrete topping slab poured for the north half of the podium\u2019s basement\" width=\"636\" height=\"477\" class=\"size-medium wp-image-22575\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Concrete-topping-slab-poured-for-the-north-half-of-the-podium\u2019s-basement-636x477.jpg 636w, https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Concrete-topping-slab-poured-for-the-north-half-of-the-podium\u2019s-basement-1024x768.jpg 1024w, https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Concrete-topping-slab-poured-for-the-north-half-of-the-podium\u2019s-basement-768x576.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Concrete-topping-slab-poured-for-the-north-half-of-the-podium\u2019s-basement-1536x1152.jpg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Concrete-topping-slab-poured-for-the-north-half-of-the-podium\u2019s-basement-2048x1536.jpg 2048w\" sizes=\"(max-width: 636px) 100vw, 636px\" \/><figcaption id=\"caption-attachment22575\" class=\"wp-caption-text\">Concrete topping slab poured for the north half of the podium\u2019s basement<\/figcaption><\/figure>\n<h2>During the weekend of March 27<sup>th<\/sup><\/h2>\n<ul>\n<li>Crews intend to work on site Saturday to continue advancing on the 12<sup>th<\/sup> floor of the tower&#8217;s core.<\/li>\n<\/ul>\n<ul>\n<li>The installation of waterproofing material on the foundation walls of the tower will continue.<\/li>\n<\/ul>\n<h2>During the week of March 29<sup>th<\/sup><sup><\/sup><\/h2>\n<ul>\n<li>At the tower\u2019s core, concrete is scheduled to be placed for the 12<sup>th<\/sup> floor early in the week. The remainder of the week will be spent removing the formwork from the 12<sup>th<\/sup> floor and installing formwork and rebar on the 13<sup>th<\/sup> floor. Concrete is scheduled for the end of the week.<\/li>\n<\/ul>\n<ul>\n<li>The installation of waterproofing at the tower\u2019s foundation walls will continue. Backfilling of these areas will follow as waterproofing is completed.<\/li>\n<\/ul>\n<ul>\n<li>Crews will continue installing the domestic water and fire protection lines into the basement of the tower.<\/li>\n<\/ul>\n<ul>\n<li>Towards the end of the week, crews will begin the removal of the top level of cross bracing for the Support of Excavation (SOE) system.<\/li>\n<\/ul>\n<ul>\n<li>On Monday between 5 pm &#8211; 10 pm, crews will be installing temporary steel members in the basement at the transition between the tower and the podium. This temporary steel will be used to support the cantilevers as the building&#8217;s structural steel members are erected begging in early May.<\/li>\n<\/ul>\n<ul>\n<li>Please be aware of all directional signage, as pedestrian travel paths may be altered. We will continue to provide you with up-to-date information via these notifications.<\/li>\n<\/ul>\n<figure id=\"attachment22576\" aria-describedby=\"caption-attachment22576\" style=\"width: 646px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2021\/03\/Final-sections-of-formwork-installed-in-advance-of-the-concrete-placement-of-the-last-section-of-foundation-walls-636x477.jpg\" alt=\"Final sections of formwork installed in advance of the concrete placement of the last section of foundation walls\" width=\"636\" height=\"477\" class=\"size-medium wp-image-22576\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Final-sections-of-formwork-installed-in-advance-of-the-concrete-placement-of-the-last-section-of-foundation-walls-636x477.jpg 636w, https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Final-sections-of-formwork-installed-in-advance-of-the-concrete-placement-of-the-last-section-of-foundation-walls-1024x768.jpg 1024w, https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Final-sections-of-formwork-installed-in-advance-of-the-concrete-placement-of-the-last-section-of-foundation-walls-768x576.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Final-sections-of-formwork-installed-in-advance-of-the-concrete-placement-of-the-last-section-of-foundation-walls-1536x1152.jpg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Final-sections-of-formwork-installed-in-advance-of-the-concrete-placement-of-the-last-section-of-foundation-walls-2048x1536.jpg 2048w\" sizes=\"(max-width: 636px) 100vw, 636px\" \/><figcaption id=\"caption-attachment22576\" class=\"wp-caption-text\">Final sections of formwork installed in advance of the concrete placement of the last section of foundation walls<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>During the weekend of March 27th Crews intend to work on site Saturday to continue advancing on the 12th floor [&hellip;]<\/p>\n","protected":false},"author":15785,"featured_media":22177,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4079,736],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/22557"}],"collection":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/users\/15785"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/comments?post=22557"}],"version-history":[{"count":7,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/22557\/revisions"}],"predecessor-version":[{"id":22586,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/22557\/revisions\/22586"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media\/22177"}],"wp:attachment":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media?parent=22557"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/categories?post=22557"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/tags?post=22557"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}