{"id":22482,"date":"2021-03-12T15:00:26","date_gmt":"2021-03-12T19:00:26","guid":{"rendered":"https:\/\/www.bu.edu\/cpo\/?p=22482"},"modified":"2023-04-05T14:19:50","modified_gmt":"2023-04-05T18:19:50","slug":"center-for-computing-data-sciences-construction-update-3-12-21","status":"publish","type":"post","link":"https:\/\/www.bu.edu\/cpo\/2021\/03\/12\/center-for-computing-data-sciences-construction-update-3-12-21\/","title":{"rendered":"Center for Computing &#038; Data Sciences \u2013 Construction Update \u2013 3\/12\/21"},"content":{"rendered":"<figure id=\"attachment22497\" aria-describedby=\"caption-attachment22497\" style=\"width: 575px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" src=\"\/cpo\/files\/2021\/03\/Rebar-installed-in-advance-of-the-concrete-p-lacement-for-the-tower\u2019s-lower-level-slab-636x477.jpg\" alt=\"Rebar installed in advance of the concrete placement for the tower\u2019s lower level slab\" width=\"565\" height=\"424\" class=\" wp-image-22497\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Rebar-installed-in-advance-of-the-concrete-p-lacement-for-the-tower\u2019s-lower-level-slab-636x477.jpg 636w, https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Rebar-installed-in-advance-of-the-concrete-p-lacement-for-the-tower\u2019s-lower-level-slab-1024x768.jpg 1024w, https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Rebar-installed-in-advance-of-the-concrete-p-lacement-for-the-tower\u2019s-lower-level-slab-768x576.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Rebar-installed-in-advance-of-the-concrete-p-lacement-for-the-tower\u2019s-lower-level-slab-1536x1152.jpg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Rebar-installed-in-advance-of-the-concrete-p-lacement-for-the-tower\u2019s-lower-level-slab-2048x1536.jpg 2048w\" sizes=\"(max-width: 565px) 100vw, 565px\" \/><figcaption id=\"caption-attachment22497\" class=\"wp-caption-text\">Rebar installed in advance of the concrete placement for the tower\u2019s lower level slab<\/figcaption><\/figure>\n<h2>During the weekend of March 13<sup>th<\/sup><\/h2>\n<ul>\n<li><span>Crews intend to work on site Saturday to continue to advance progress on the 8th floor of the tower\u2019s core.<\/span><\/li>\n<\/ul>\n<h2>During the week of March 15<sup>th<\/sup><sup><\/sup><\/h2>\n<ul>\n<li><span>At the tower\u2019s core, concrete is scheduled to be placed for the 8th floor early in the week. The remaining of the week will be spent removing the formwork from the 8th floor and installing formwork and rebar at the 9th.<\/span><\/li>\n<\/ul>\n<ul>\n<li><span>Crews will continue with the installation of rebar and formwork for the remaining section of the tower\u2019s foundation wall at the transition between the tower and the podium.<\/span><\/li>\n<\/ul>\n<ul>\n<li><span>The installation of waterproofing at the tower\u2019s foundation walls will continue. The backfilling of these areas will follow as waterproofing is completed.<\/span><\/li>\n<\/ul>\n<ul>\n<li><span>In the podium\u2019s basement, installation of metal decking for the top of the duct tunnel will continue, while the installation of under slab conduit and piping progresses.<\/span><\/li>\n<\/ul>\n<ul>\n<li><span>Crews will begin loading and spreading crushed stone to the basement of the podium and the lower level of the tower, which will serve as a subgrade material for the finish slabs.<\/span><\/li>\n<\/ul>\n<ul>\n<li><span>Please be aware of all directional signage, as pedestrian travel paths may be altered. We will continue to provide you with up-to-date information via these notifications.<\/span><\/li>\n<\/ul>\n<figure id=\"attachment22498\" aria-describedby=\"caption-attachment22498\" style=\"width: 549px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" src=\"\/cpo\/files\/2021\/03\/Final-details-coming-together-prior-to-conc-rete-placement-of-the-core\u2019s-7th-floor-477x636.jpeg\" alt=\"Final details coming together prior to concrete placement of the core\u2019s 7th floor\" width=\"539\" height=\"719\" class=\" wp-image-22498\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Final-details-coming-together-prior-to-conc-rete-placement-of-the-core\u2019s-7th-floor-477x636.jpeg 477w, https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Final-details-coming-together-prior-to-conc-rete-placement-of-the-core\u2019s-7th-floor-768x1024.jpeg 768w, https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Final-details-coming-together-prior-to-conc-rete-placement-of-the-core\u2019s-7th-floor-1152x1536.jpeg 1152w, https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Final-details-coming-together-prior-to-conc-rete-placement-of-the-core\u2019s-7th-floor-1536x2048.jpeg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2021\/03\/Final-details-coming-together-prior-to-conc-rete-placement-of-the-core\u2019s-7th-floor-scaled.jpeg 1920w\" sizes=\"(max-width: 539px) 100vw, 539px\" \/><figcaption id=\"caption-attachment22498\" class=\"wp-caption-text\">Final details coming together prior to concrete placement of the core\u2019s 7th floor<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>During the weekend of March 13th Crews intend to work on site Saturday to continue to advance progress on the [&hellip;]<\/p>\n","protected":false},"author":15785,"featured_media":22498,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4079,736],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/22482"}],"collection":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/users\/15785"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/comments?post=22482"}],"version-history":[{"count":6,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/22482\/revisions"}],"predecessor-version":[{"id":22500,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/22482\/revisions\/22500"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media\/22498"}],"wp:attachment":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media?parent=22482"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/categories?post=22482"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/tags?post=22482"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}