{"id":22294,"date":"2021-02-05T14:22:41","date_gmt":"2021-02-05T18:22:41","guid":{"rendered":"https:\/\/www.bu.edu\/cpo\/?p=22294"},"modified":"2023-04-12T13:25:54","modified_gmt":"2023-04-12T17:25:54","slug":"center-for-computing-data-sciences-construction-update-2-5-21","status":"publish","type":"post","link":"https:\/\/www.bu.edu\/cpo\/2021\/02\/05\/center-for-computing-data-sciences-construction-update-2-5-21\/","title":{"rendered":"Center for Computing &#038; Data Sciences \u2013 Construction Update \u2013 2\/5\/21"},"content":{"rendered":"<figure id=\"attachment22311\" aria-describedby=\"caption-attachment22311\" style=\"width: 618px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2021\/02\/Hoisting-core-interior-formwork-panels-into-place-636x234.jpg\" alt=\"\" width=\"608\" height=\"224\" class=\" wp-image-22311\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2021\/02\/Hoisting-core-interior-formwork-panels-into-place-636x234.jpg 636w, https:\/\/www.bu.edu\/cpo\/files\/2021\/02\/Hoisting-core-interior-formwork-panels-into-place-1024x377.jpg 1024w, https:\/\/www.bu.edu\/cpo\/files\/2021\/02\/Hoisting-core-interior-formwork-panels-into-place-768x283.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2021\/02\/Hoisting-core-interior-formwork-panels-into-place-1536x565.jpg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2021\/02\/Hoisting-core-interior-formwork-panels-into-place-2048x754.jpg 2048w\" sizes=\"(max-width: 608px) 100vw, 608px\" \/><figcaption id=\"caption-attachment22311\" class=\"wp-caption-text\">Hoisting core interior formwork panels into place<\/figcaption><\/figure>\n<h2>During the weekend of February 6<sup>th<\/sup><\/h2>\n<ul>\n<li>Crews will be on site Saturday to continue to install rebar and formwork for the tower\u2019s core.<\/li>\n<\/ul>\n<h2>During the week of February 8<sup>th<\/sup><sup><\/sup><\/h2>\n<ul>\n<li>Installation of rebar and formwork will begin next to Sargent College for the bike shelter foundation.<\/li>\n<\/ul>\n<ul>\n<li>Following the completion of the concrete work for the below-slab duct tunnel, crews will begin installing the ductwork.<\/li>\n<\/ul>\n<ul>\n<li>Rebar and formwork installation will continue at the tower\u2019s north foundation wall and core. Concrete has been placed to the 2<sup>nd<\/sup> floor; rebar installation is now underway for the 3<sup>rd<\/sup> floor with concrete scheduled to be placed mid-week.<\/li>\n<\/ul>\n<ul>\n<li>Please be aware of all directional signage, as pedestrian travel paths may be altered. We will continue to provide you with up-to-date information via these notifications.<\/li>\n<\/ul>\n<figure id=\"attachment22307\" aria-describedby=\"caption-attachment22307\" style=\"width: 626px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2021\/02\/Installation-of-rebar-at-the-tower\u2019s-north-foundation-wall-636x333.jpg\" alt=\"\" width=\"616\" height=\"322\" class=\" wp-image-22307\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2021\/02\/Installation-of-rebar-at-the-tower\u2019s-north-foundation-wall-636x333.jpg 636w, https:\/\/www.bu.edu\/cpo\/files\/2021\/02\/Installation-of-rebar-at-the-tower\u2019s-north-foundation-wall-1024x536.jpg 1024w, https:\/\/www.bu.edu\/cpo\/files\/2021\/02\/Installation-of-rebar-at-the-tower\u2019s-north-foundation-wall-768x402.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2021\/02\/Installation-of-rebar-at-the-tower\u2019s-north-foundation-wall-1536x803.jpg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2021\/02\/Installation-of-rebar-at-the-tower\u2019s-north-foundation-wall-2048x1071.jpg 2048w\" sizes=\"(max-width: 616px) 100vw, 616px\" \/><figcaption id=\"caption-attachment22307\" class=\"wp-caption-text\">Installation of rebar at the tower\u2019s north foundation wall<\/figcaption><\/figure>\n<figure id=\"attachment22310\" aria-describedby=\"caption-attachment22310\" style=\"width: 624px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2021\/02\/Final-section-of-the-tower\u2019s-south-foundation-wall-was-completed-this-week-636x477.jpg\" alt=\"\" width=\"614\" height=\"460\" class=\" wp-image-22310\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2021\/02\/Final-section-of-the-tower\u2019s-south-foundation-wall-was-completed-this-week-636x477.jpg 636w, https:\/\/www.bu.edu\/cpo\/files\/2021\/02\/Final-section-of-the-tower\u2019s-south-foundation-wall-was-completed-this-week-1024x768.jpg 1024w, https:\/\/www.bu.edu\/cpo\/files\/2021\/02\/Final-section-of-the-tower\u2019s-south-foundation-wall-was-completed-this-week-768x576.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2021\/02\/Final-section-of-the-tower\u2019s-south-foundation-wall-was-completed-this-week-1536x1152.jpg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2021\/02\/Final-section-of-the-tower\u2019s-south-foundation-wall-was-completed-this-week-2048x1536.jpg 2048w\" sizes=\"(max-width: 614px) 100vw, 614px\" \/><figcaption id=\"caption-attachment22310\" class=\"wp-caption-text\">Final section of the tower\u2019s south foundation wall was completed this week<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>During the weekend of February 6th Crews will be on site Saturday to continue to install rebar and formwork for [&hellip;]<\/p>\n","protected":false},"author":15785,"featured_media":22307,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4079,736],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/22294"}],"collection":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/users\/15785"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/comments?post=22294"}],"version-history":[{"count":8,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/22294\/revisions"}],"predecessor-version":[{"id":22337,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/22294\/revisions\/22337"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media\/22307"}],"wp:attachment":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media?parent=22294"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/categories?post=22294"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/tags?post=22294"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}