{"id":22008,"date":"2020-11-25T12:13:39","date_gmt":"2020-11-25T16:13:39","guid":{"rendered":"https:\/\/www.bu.edu\/cpo\/?p=22008"},"modified":"2023-04-12T13:27:13","modified_gmt":"2023-04-12T17:27:13","slug":"center-for-computing-data-sciences-construction-update-11-25-20","status":"publish","type":"post","link":"https:\/\/www.bu.edu\/cpo\/2020\/11\/25\/center-for-computing-data-sciences-construction-update-11-25-20\/","title":{"rendered":"Center for Computing &#038; Data Sciences \u2013 Construction Update \u2013 11\/25\/20"},"content":{"rendered":"<h2 style=\"background-color: #404956; color: white; padding: 10px; text-align: center;\">During the weekend of November 28<sup>th<\/sup><\/h2>\n<figure id=\"attachment22010\" aria-describedby=\"caption-attachment22010\" style=\"width: 619px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2020\/11\/Installing-reinforcing-bars-for-the-Tower-slab-636x329.jpg\" alt=\"\" width=\"609\" height=\"315\" class=\" wp-image-22010\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2020\/11\/Installing-reinforcing-bars-for-the-Tower-slab-636x329.jpg 636w, https:\/\/www.bu.edu\/cpo\/files\/2020\/11\/Installing-reinforcing-bars-for-the-Tower-slab-1024x530.jpg 1024w, https:\/\/www.bu.edu\/cpo\/files\/2020\/11\/Installing-reinforcing-bars-for-the-Tower-slab-768x397.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2020\/11\/Installing-reinforcing-bars-for-the-Tower-slab-1536x795.jpg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2020\/11\/Installing-reinforcing-bars-for-the-Tower-slab-2048x1059.jpg 2048w\" sizes=\"(max-width: 609px) 100vw, 609px\" \/><figcaption id=\"caption-attachment22010\" class=\"wp-caption-text\">Installing reinforcing bars for the tower slab<\/figcaption><\/figure>\n<ul>\n<li>In preparation for significant foundation concrete placement, scheduled for 12\/5\/20, the contractor is required to adjust normal operations. As a result, there are several notable changes that\u00a0were put in\u00a0place this week and will continue.<\/li>\n<\/ul>\n<ul>\n<li>Beginning at 6 am on Saturday and Sunday, deliveries of reinforcing materials will arrive on the site. On the west side of the site, crews will continue the installation of reinforcing materials for the mat slab in the tower portion of the building.<\/li>\n<\/ul>\n<h2 style=\"background-color: #404956; color: white; padding: 10px; text-align: center;\">During the week of November 30<sup>th<\/sup><\/h2>\n<ul>\n<li>Deliveries of materials starting at 6 am will continue, working extended days Monday \u2013 Friday will occur.<\/li>\n<\/ul>\n<ul>\n<li>In the podium, located at the east end of the site, the installation of reinforcing materials and formwork for the ground floor slab will continue\u00a0<span>in advance of the concrete placement for the slab.<\/span><\/li>\n<\/ul>\n<ul>\n<li>Backfilling against the podium foundation walls will begin.<\/li>\n<\/ul>\n<ul>\n<li>The installation of reinforcing materials for the tower\u2019s mat slab will continue throughout the week as the project prepares for the slab\u2019s concrete placement in early December.<\/li>\n<\/ul>\n<ul>\n<li>On Saturday, December 5th, roughly 5,000 cubic yards of concrete will be poured for the tower\u2019s mat slab. This critical activity will require an extended work day on site due to the need for continuous placement. Crews will begin on site at 4 am and will continue until the activity is complete around 11 pm. <strong>This activity will require three concrete pumps that will be set up on site. The third pump\u00a0will\u00a0be\u00a0set up on the west side of the site and into the travel lane of Granby Street<\/strong>. <strong>Vehicular through traffic will utilize the parking lane and pedestrian travel will not be affected.<\/strong><\/li>\n<\/ul>\n<ul>\n<li>Please be aware of all directional signage, as pedestrian travel paths may be altered. We will continue to provide you with up to date information via these notifications.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>During the weekend of November 28th In preparation for significant foundation concrete placement, scheduled for 12\/5\/20, the contractor is required [&hellip;]<\/p>\n","protected":false},"author":15785,"featured_media":22010,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4079,736],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/22008"}],"collection":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/users\/15785"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/comments?post=22008"}],"version-history":[{"count":7,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/22008\/revisions"}],"predecessor-version":[{"id":22016,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/22008\/revisions\/22016"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media\/22010"}],"wp:attachment":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media?parent=22008"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/categories?post=22008"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/tags?post=22008"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}