{"id":21657,"date":"2020-09-18T14:26:56","date_gmt":"2020-09-18T18:26:56","guid":{"rendered":"https:\/\/www.bu.edu\/cpo\/?p=21657"},"modified":"2023-04-12T13:28:49","modified_gmt":"2023-04-12T17:28:49","slug":"center-for-computing-data-sciences-construction-update-9-18-20","status":"publish","type":"post","link":"https:\/\/www.bu.edu\/cpo\/2020\/09\/18\/center-for-computing-data-sciences-construction-update-9-18-20\/","title":{"rendered":"Center for Computing &#038; Data Sciences \u2013 Construction Update \u2013 9\/18\/20"},"content":{"rendered":"<figure id=\"attachment21658\" aria-describedby=\"caption-attachment21658\" style=\"width: 623px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2020\/09\/Excavation-continues-at-the-tower-636x477.jpeg\" alt=\"\" width=\"613\" height=\"461\" class=\" wp-image-21658\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Excavation-continues-at-the-tower-636x477.jpeg 636w, https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Excavation-continues-at-the-tower-1024x768.jpeg 1024w, https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Excavation-continues-at-the-tower-768x576.jpeg 768w, https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Excavation-continues-at-the-tower-1536x1152.jpeg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Excavation-continues-at-the-tower-2048x1536.jpeg 2048w\" sizes=\"(max-width: 613px) 100vw, 613px\" \/><figcaption id=\"caption-attachment21658\" class=\"wp-caption-text\">Excavation continues at the tower<\/figcaption><\/figure>\n<h2>During the weekend of September 19<sup>th<\/sup><\/h2>\n<ul>\n<li>On Saturday, crews will be on site to continue with the excavation in the tower portion of the building, along with the installation of bracing for the support of the excavation system.<\/li>\n<\/ul>\n<h2>During the week of September 21<sup>st<\/sup><\/h2>\n<ul>\n<li>Excavation down to the 2<sup>nd<\/sup> level of bracing for the support of the excavation system continues in the tower portion of the building.<\/li>\n<li>Installation of cross bracing members, for the support of the excavation system, continues as excavation progresses in the tower.<\/li>\n<li>Formwork and rebar placement will begin for the structural mat slab in the podium.<\/li>\n<li>During the week of September 28<sup>th<\/sup>, a large concrete pour (roughly 1,200 container yards and approximately 120 trucks) is anticipated to occur; additional information will be included in the next update.<\/li>\n<li>Please be aware of all directional signage, as pedestrian travel paths may be altered.<\/li>\n<li>We will continue to provide you with up-to-date information via these notifications.<\/li>\n<\/ul>\n<div class=\"mceTemp\"><\/div>\n<figure id=\"attachment21659\" aria-describedby=\"caption-attachment21659\" style=\"width: 620px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2020\/09\/Tower-crane-assembled-onsite-last-weekend-477x636.jpeg\" alt=\"\" width=\"610\" height=\"814\" class=\" wp-image-21659\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Tower-crane-assembled-onsite-last-weekend-477x636.jpeg 477w, https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Tower-crane-assembled-onsite-last-weekend-768x1024.jpeg 768w, https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Tower-crane-assembled-onsite-last-weekend-1152x1536.jpeg 1152w, https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Tower-crane-assembled-onsite-last-weekend-1536x2048.jpeg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Tower-crane-assembled-onsite-last-weekend-scaled.jpeg 1920w\" sizes=\"(max-width: 610px) 100vw, 610px\" \/><figcaption id=\"caption-attachment21659\" class=\"wp-caption-text\">Tower crane assembled on site last weekend<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>During the weekend of September 19th On Saturday, crews will be on site to continue with the excavation in the [&hellip;]<\/p>\n","protected":false},"author":15785,"featured_media":21658,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4079,736],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/21657"}],"collection":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/users\/15785"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/comments?post=21657"}],"version-history":[{"count":5,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/21657\/revisions"}],"predecessor-version":[{"id":21664,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/21657\/revisions\/21664"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media\/21658"}],"wp:attachment":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media?parent=21657"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/categories?post=21657"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/tags?post=21657"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}