{"id":21595,"date":"2020-09-04T16:57:45","date_gmt":"2020-09-04T20:57:45","guid":{"rendered":"https:\/\/www.bu.edu\/cpo\/?p=21595"},"modified":"2023-04-12T13:29:07","modified_gmt":"2023-04-12T17:29:07","slug":"cfa-renovations-construction-update-9-4-20","status":"publish","type":"post","link":"https:\/\/www.bu.edu\/cpo\/2020\/09\/04\/cfa-renovations-construction-update-9-4-20\/","title":{"rendered":"CFA Renovations \u2013 Construction Update \u2013 9\/4\/20"},"content":{"rendered":"<h2 class=\"null\">For the period of September 4th &#8211; September 11th:<\/h2>\n<figure id=\"attachment21444\" aria-describedby=\"caption-attachment21444\" style=\"width: 607px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2020\/08\/CFA-image-636x477.jpg\" alt=\"\" width=\"597\" height=\"448\" class=\" wp-image-21444\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2020\/08\/CFA-image-636x477.jpg 636w, https:\/\/www.bu.edu\/cpo\/files\/2020\/08\/CFA-image-1024x768.jpg 1024w, https:\/\/www.bu.edu\/cpo\/files\/2020\/08\/CFA-image-768x576.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2020\/08\/CFA-image-1536x1152.jpg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2020\/08\/CFA-image.jpg 2016w\" sizes=\"(max-width: 597px) 100vw, 597px\" \/><figcaption id=\"caption-attachment21444\" class=\"wp-caption-text\">Front Fa\u00e7ade<\/figcaption><\/figure>\n<p class=\"x_MsoNormal\"><b>West Fa\u00e7ade<\/b><\/p>\n<ul type=\"disc\">\n<li class=\"x_MsoListParagraph\">The installation of bike racks is scheduled for the end of next week.<\/li>\n<\/ul>\n<p class=\"x_MsoNormal\"><b>North Fa\u00e7ade<\/b><\/p>\n<ul type=\"disc\">\n<li class=\"x_MsoListParagraph\">Relieving angles and brick install on the lower level will continue.<\/li>\n<li class=\"x_MsoListParagraph\">Work rebuilding the east chimney will continue.<\/li>\n<li class=\"x_MsoListParagraph\">Scaffolding removal will begin.<\/li>\n<\/ul>\n<p><span>As a reminder to all, please be aware of all directional signage, as pedestrian travel paths may be altered at both the interior and exterior of the building. Your safety is imperative!<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>For the period of September 4th &#8211; September 11th: West Fa\u00e7ade The installation of bike racks is scheduled for the [&hellip;]<\/p>\n","protected":false},"author":15785,"featured_media":21444,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4079,736],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/21595"}],"collection":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/users\/15785"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/comments?post=21595"}],"version-history":[{"count":5,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/21595\/revisions"}],"predecessor-version":[{"id":21606,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/21595\/revisions\/21606"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media\/21444"}],"wp:attachment":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media?parent=21595"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/categories?post=21595"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/tags?post=21595"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}