{"id":21519,"date":"2020-09-11T15:28:05","date_gmt":"2020-09-11T19:28:05","guid":{"rendered":"https:\/\/www.bu.edu\/cpo\/?p=21519"},"modified":"2023-04-12T13:29:00","modified_gmt":"2023-04-12T17:29:00","slug":"center-for-computing-data-sciences-construction-update-9-11-20","status":"publish","type":"post","link":"https:\/\/www.bu.edu\/cpo\/2020\/09\/11\/center-for-computing-data-sciences-construction-update-9-11-20\/","title":{"rendered":"Center for Computing &#038; Data Sciences \u2013 Construction Update  \u2013 9\/11\/20"},"content":{"rendered":"<figure id=\"attachment21638\" aria-describedby=\"caption-attachment21638\" style=\"width: 608px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" src=\"\/cpo\/files\/2020\/09\/Installing-waterproofing-membrane-636x281.jpg\" alt=\"Installing waterproofing membrane\" width=\"598\" height=\"264\" class=\" wp-image-21638\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Installing-waterproofing-membrane-636x281.jpg 636w, https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Installing-waterproofing-membrane-1024x452.jpg 1024w, https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Installing-waterproofing-membrane-768x339.jpg 768w, https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Installing-waterproofing-membrane-1536x678.jpg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Installing-waterproofing-membrane-2048x904.jpg 2048w\" sizes=\"(max-width: 598px) 100vw, 598px\" \/><figcaption id=\"caption-attachment21638\" class=\"wp-caption-text\">Installing waterproofing membrane<\/figcaption><\/figure>\n<h2><strong>During the weekend of September 12<sup>th<\/sup><\/strong><\/h2>\n<ul>\n<li>On Saturday, crews will be on site early to begin the set up of the tower crane. <span>For additional information on the upcoming activity, please visit <\/span><a href=\"\/cpo\/files\/2020\/08\/Tower-Crane-Narrative-to-Community-8.28.20-1.pdf\">Tower Crane Narrative to Community<\/a>. Access around the site will be limited.<\/li>\n<li>Also, on Saturday, excavation will continue in the tower portion of the building.<\/li>\n<\/ul>\n<h2><strong>During the week of September 14<sup>th<\/sup><\/strong><\/h2>\n<ul>\n<li>Excavation for the building foundations continue in the tower portion of the building and downward to the 2<sup>nd<\/sup> level of bracing for the SOE system, roughly 14 feet down from existing grade.<\/li>\n<li>Installation of cross bracing members for the support of the excavation system will follow behind the excavation.<\/li>\n<li>Installation of the waterproofing membrane on the recently poured concrete \u201cmud mat\u201d will continue.<\/li>\n<li>Please be aware of all directional signage, as pedestrian travel paths may be altered.<\/li>\n<li>We will continue to provide you with up-to-date information via these notifications.<\/li>\n<\/ul>\n<figure id=\"attachment21637\" aria-describedby=\"caption-attachment21637\" style=\"width: 613px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" src=\"\/cpo\/files\/2020\/09\/Pouring-the-2nd-half-of-the-concrete-mud-matt-in-the-podium-636x477.jpeg\" alt=\"Pouring the 2nd half of the concrete mud matt in the podium\" width=\"603\" height=\"451\" class=\" wp-image-21637\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Pouring-the-2nd-half-of-the-concrete-mud-matt-in-the-podium-636x477.jpeg 636w, https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Pouring-the-2nd-half-of-the-concrete-mud-matt-in-the-podium-1024x768.jpeg 1024w, https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Pouring-the-2nd-half-of-the-concrete-mud-matt-in-the-podium-768x576.jpeg 768w, https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Pouring-the-2nd-half-of-the-concrete-mud-matt-in-the-podium-1536x1152.jpeg 1536w, https:\/\/www.bu.edu\/cpo\/files\/2020\/09\/Pouring-the-2nd-half-of-the-concrete-mud-matt-in-the-podium-2048x1536.jpeg 2048w\" sizes=\"(max-width: 603px) 100vw, 603px\" \/><figcaption id=\"caption-attachment21637\" class=\"wp-caption-text\">Pouring the 2nd half of the concrete mud matt in the podium<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>During the weekend of September 12th On Saturday, crews will be on site early to begin the set up of [&hellip;]<\/p>\n","protected":false},"author":15785,"featured_media":21638,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4079,736],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/21519"}],"collection":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/users\/15785"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/comments?post=21519"}],"version-history":[{"count":6,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/21519\/revisions"}],"predecessor-version":[{"id":21641,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/21519\/revisions\/21641"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media\/21638"}],"wp:attachment":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media?parent=21519"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/categories?post=21519"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/tags?post=21519"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}