{"id":20723,"date":"2020-06-12T12:05:54","date_gmt":"2020-06-12T16:05:54","guid":{"rendered":"https:\/\/www.bu.edu\/cpo\/?p=20723"},"modified":"2023-04-12T13:32:37","modified_gmt":"2023-04-12T17:32:37","slug":"center-for-computing-data-sciences-construction-update-6-12-20","status":"publish","type":"post","link":"https:\/\/www.bu.edu\/cpo\/2020\/06\/12\/center-for-computing-data-sciences-construction-update-6-12-20\/","title":{"rendered":"Center for Computing &#038; Data Sciences \u2013 Construction Update  \u2013 6\/12\/20"},"content":{"rendered":"<h2>During the week of June 15<sup>th<\/sup><\/h2>\n<ul>\n<li>Installation of monitoring points for utilities will continue.<\/li>\n<li>Excavation within the perimeter of the site for installation of the support of excavation system will continue.<\/li>\n<li>Installation of utility feeds from Granby Street to the site will begin.<\/li>\n<li>In the second half of the week, a crane will mobilize to the site with equipment for the Support Of Excavation (SOE) system, installation will begin on Monday, June 22<sup>nd<\/sup>.<\/li>\n<li>At the mock-up (766 Commonwealth Ave. parking lot), installation of the fa\u00e7ade panels will begin.<\/li>\n<li>As activity in and around the site begins to increase, please be aware of all directional signage, as pedestrian travel paths may be altered.<\/li>\n<li>We will continue to provide you with up to date information via these notifications.<\/li>\n<\/ul>\n<figure id=\"attachment20580\" aria-describedby=\"caption-attachment20580\" style=\"width: 487px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2020\/06\/Surcharge-material-will-remain-in-place-through-the-end-of-June-477x636.jpg\" alt=\"Surcharge material will remain in place through the end of June.\" width=\"477\" height=\"636\" class=\"size-medium wp-image-20580\" srcset=\"https:\/\/www.bu.edu\/cpo\/files\/2020\/06\/Surcharge-material-will-remain-in-place-through-the-end-of-June-477x636.jpg 477w, https:\/\/www.bu.edu\/cpo\/files\/2020\/06\/Surcharge-material-will-remain-in-place-through-the-end-of-June-768x1024.jpg 768w\" sizes=\"(max-width: 477px) 100vw, 477px\" \/><figcaption id=\"caption-attachment20580\" class=\"wp-caption-text\">Surcharge material will remain in place through the end of June<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>During the week of June 15th Installation of monitoring points for utilities will continue. Excavation within the perimeter of the [&hellip;]<\/p>\n","protected":false},"author":15785,"featured_media":20725,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4079,736],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/20723"}],"collection":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/users\/15785"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/comments?post=20723"}],"version-history":[{"count":7,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/20723\/revisions"}],"predecessor-version":[{"id":20733,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/20723\/revisions\/20733"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media\/20725"}],"wp:attachment":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media?parent=20723"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/categories?post=20723"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/tags?post=20723"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}