{"id":20458,"date":"2020-05-29T11:17:19","date_gmt":"2020-05-29T15:17:19","guid":{"rendered":"https:\/\/www.bu.edu\/cpo\/?p=20458"},"modified":"2023-04-12T13:33:53","modified_gmt":"2023-04-12T17:33:53","slug":"center-for-computing-data-sciences-construction-update-5-29-20","status":"publish","type":"post","link":"https:\/\/www.bu.edu\/cpo\/2020\/05\/29\/center-for-computing-data-sciences-construction-update-5-29-20\/","title":{"rendered":"Center for Computing &#038; Data Sciences \u2013 Construction Update \u2013 5\/29\/20"},"content":{"rendered":"<figure id=\"attachment20470\" aria-describedby=\"caption-attachment20470\" style=\"width: 583px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"\/cpo\/files\/2020\/05\/The-final-truck-loads-of-surcharge-material-477x636.jpg\" alt=\"\" width=\"573\" height=\"762\" class=\" wp-image-20470\" \/><figcaption id=\"caption-attachment20470\" class=\"wp-caption-text\">The final truck loads of surcharge material<\/figcaption><\/figure>\n<h3>During the week of June 1<sup>st<\/sup>:<\/h3>\n<ul>\n<li>Sidewalk protection and pedestrian barriers will be placed in the parking lane as preparations begin to shift the sidewalk for the duration of construction, upon receipt of the construction management plan by the contractor.<\/li>\n<\/ul>\n<ul>\n<li>Any remaining furnishings (benches, signage, etc.) will be removed from the site, upon receipt of the construction management plan by the contractor.<\/li>\n<\/ul>\n<ul>\n<li>Excavation within the perimeter of the site for installation of the support of excavation system will continue, upon receipt of the construction management plan by the contractor.<\/li>\n<\/ul>\n<ul>\n<li>Installation of utility feeds from Granby St. to the site will begin, upon receipt of the construction management plan by the contractor.<\/li>\n<\/ul>\n<ul>\n<li>At the mock-up (766 Commonwealth Ave. parking lot), the steel structure will be painted white.<\/li>\n<\/ul>\n<ul>\n<li>As activity in and around the site begins to increase, please be aware of all directional signage, as pedestrian travel paths may be altered.<\/li>\n<\/ul>\n<ul>\n<li>We will continue to provide you with up-to-date information via these notifications.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>During the week of June 1st: Sidewalk protection and pedestrian barriers will be placed in the parking lane as preparations [&hellip;]<\/p>\n","protected":false},"author":15785,"featured_media":20470,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4079,736],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/20458"}],"collection":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/users\/15785"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/comments?post=20458"}],"version-history":[{"count":7,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/20458\/revisions"}],"predecessor-version":[{"id":20476,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/20458\/revisions\/20476"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media\/20470"}],"wp:attachment":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media?parent=20458"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/categories?post=20458"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/tags?post=20458"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}