{"id":15575,"date":"2018-03-15T09:44:38","date_gmt":"2018-03-15T13:44:38","guid":{"rendered":"https:\/\/www.bu.edu\/cpo\/?p=15575"},"modified":"2023-04-12T13:58:06","modified_gmt":"2023-04-12T17:58:06","slug":"15575","status":"publish","type":"post","link":"https:\/\/www.bu.edu\/cpo\/2018\/03\/15\/15575\/","title":{"rendered":"Myles Standish Hall &#8211; Construction Activity &#8211; For 3\/17\/18 to 3\/23\/18"},"content":{"rendered":"<p><img loading=\"lazy\" src=\"\/cpo\/files\/2018\/03\/IMG_9076-e1521120957528.jpg\" alt=\"Myles Standish Hall - Construction Activity - For 3\/17\/18 to 3\/23\/18\" class=\"alignnone wp-image-15576 size-full\" height=\"225\" width=\"300\" \/> <img loading=\"lazy\" src=\"\/cpo\/files\/2018\/03\/IMG_9093-e1521120979948.jpg\" alt=\"Myles Standish Hall - Construction Activity - For 3\/17\/18 to 3\/23\/18\" class=\"alignnone wp-image-15577 size-full\" height=\"225\" width=\"300\" \/><\/p>\n<p><strong><u>For 3\/17\/18 to 3\/23\/18:<\/u><\/strong><\/p>\n<p><strong>Deliveries<\/strong> \u2013 Subcontractors will receive deliveries all week between 7 a.m. and 6 p.m. on both Beacon Street and Bay State Road.<\/p>\n<p><strong>Onsite Construction<\/strong><\/p>\n<p><strong>Saturday Work \u2013 3\/17\/18<\/strong><\/p>\n<ul>\n<li>Clean up and loadout<\/li>\n<li>Interior taping<\/li>\n<\/ul>\n<p><strong>\u00a0Demolition\/Loadout<\/strong><\/p>\n<ul>\n<li>Load out at Beacon Street and Bay State Road \u2013 Load out demolition debris from 1<sup>st<\/sup> floor to dumpster with ongoing daily dumpster swaps<\/li>\n<\/ul>\n<p><strong>Masonry Restoration (Exterior &#8211; Bay State Road &amp; Beacon Street)<\/strong><\/p>\n<ul>\n<li>Continue with masonry restoration and demolition \u2013 Bay State Road &amp; Beacon Street<\/li>\n<li>Restoration of fa\u00e7ade at hoist location \u2013 Beacon Street<\/li>\n<\/ul>\n<p><strong>Roof Myles (Exterior)<\/strong><\/p>\n<ul>\n<li>MEP insulation<\/li>\n<\/ul>\n<p><strong>Site<\/strong><\/p>\n<ul>\n<li>Point Park\n<ul>\n<li>Continue drilling well points and installation of drainage<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>For 3\/17\/18 to 3\/23\/18: Deliveries \u2013 Subcontractors will receive deliveries all week between 7 a.m. and 6 p.m. on both [&hellip;]<\/p>\n","protected":false},"author":4064,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4079,736],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/15575"}],"collection":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/users\/4064"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/comments?post=15575"}],"version-history":[{"count":2,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/15575\/revisions"}],"predecessor-version":[{"id":15579,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/15575\/revisions\/15579"}],"wp:attachment":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media?parent=15575"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/categories?post=15575"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/tags?post=15575"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}