{"id":14478,"date":"2016-09-09T16:34:30","date_gmt":"2016-09-09T20:34:30","guid":{"rendered":"https:\/\/www.bu.edu\/cpo\/?p=14478"},"modified":"2016-09-09T16:34:30","modified_gmt":"2016-09-09T20:34:30","slug":"myles-standish-hall-construction-activity-91016-91616","status":"publish","type":"post","link":"https:\/\/www.bu.edu\/cpo\/2016\/09\/09\/myles-standish-hall-construction-activity-91016-91616\/","title":{"rendered":"Myles Standish Hall &#8211; Construction Activity &#8211;  9\/10\/16 &#8211;  9\/16\/16"},"content":{"rendered":"<p><strong><span style=\"text-decoration: underline;\">For 9\/10\/16 to 9\/16\/16: <\/span><\/strong><\/p>\n<p><img loading=\"lazy\" src=\"\/cpo\/files\/2016\/09\/9th-Floor-e1473453206978.jpg\" alt=\"Myles 9\/9\/16\" class=\"alignnone size-full wp-image-14479\" height=\"225\" width=\"300\" \/> <img loading=\"lazy\" src=\"\/cpo\/files\/2016\/09\/Brick-e1473453218236.jpg\" alt=\"Myles 9\/9\/16\" class=\"alignnone size-full wp-image-14480\" height=\"225\" width=\"300\" \/><br \/>\n<strong>Deliveries<\/strong><\/p>\n<ul>\n<li>Subcontractors will receive deliveries all week between 7 a.m. and 6 p.m. on both Beacon Street and Bay State Road.<\/li>\n<\/ul>\n<p><strong>\u00a0Onsite Construction<\/strong><\/p>\n<p><strong>Saturday 9\/10\/16 &#8211; No work <\/strong><\/p>\n<p><strong>Beacon Street Work &#8211; \u00a09\/12\/16 through 9\/27\/16 &#8211; <\/strong>Starting on Tuesday, September 6, the following construction work will be occurring on Beacon Street from 9:30 a.m. until 3:30 p.m.<\/p>\n<ul>\n<li>Site work \u2013 Bring water and drain lines in off of Beacon Street and into Myles.<\/li>\n<li>Activities will require workers, trucks, and equipment on Beacon Street.<\/li>\n<li>All permitting has been secured with BTD.<\/li>\n<\/ul>\n<p><strong>Demolition Abatement<\/strong><\/p>\n<ul>\n<li>Load out at Beacon Street \u2013 Load out demolition debris from 1<sup>st<\/sup> floor to dumpster \u00a0with ongoing daily dumpster swaps.<\/li>\n<li>Continue with load out down chute (interior).<\/li>\n<li>Demolition and load out of basement<\/li>\n<li>Abatement on floor\u00a01 (interior)<\/li>\n<li>Demolition of floor\u00a01 (interior)<\/li>\n<li>Saw-cutting floors 4 &amp; 5<\/li>\n<\/ul>\n<p><strong>Masonry Restoration (Exterior &#8211; Bay State Road &amp; Beacon Street)<\/strong><\/p>\n<ul>\n<li>Continue with rebuilding fa\u00e7ade above Annex off of swing staging.<\/li>\n<li>Continue installation of relieving angles &#8211; Bay State Road and Beacon Street sides of building.<\/li>\n<li>Continue rebuilding exterior fa\u00e7ade &#8211; Bay State Road side of building.<\/li>\n<\/ul>\n<p><strong>\u00a0Roof (Exterior)<\/strong><\/p>\n<ul>\n<li>Coring, saw-cutting, and demo of new holes and openings<\/li>\n<li>Roof blocking and plywood installation at parapets<\/li>\n<li>Temporary roofing of penetrations and parapet<\/li>\n<\/ul>\n<p><strong>Alley Between Annex and Myles at Bay State Road (Exterior)<\/strong><\/p>\n<ul>\n<li>Continue with masonry demo (Myles).<\/li>\n<li>Start installation of brick (Annex).<\/li>\n<\/ul>\n<p><strong>Site Utility Work<\/strong><\/p>\n<ul>\n<ul>\n<li>Continue load out of soil from basement.<\/li>\n<\/ul>\n<\/ul>\n<p><em>For questions, please contact\u00a0<a href=\"mailto:bkelley@compasspminc.com\">Brian Kelley<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Saturday 9\/10\/16 &#8211; No work. Beacon Street Work &#8211;  9\/12\/16 through 9\/27\/16 &#8211; Starting on Tuesday, September 6, the following construction work will be occurring on Beacon Street from 9:30 a.m. until 3:30 p.m.<\/p>\n","protected":false},"author":4064,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[736],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/14478"}],"collection":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/users\/4064"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/comments?post=14478"}],"version-history":[{"count":1,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/14478\/revisions"}],"predecessor-version":[{"id":14481,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/posts\/14478\/revisions\/14481"}],"wp:attachment":[{"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/media?parent=14478"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/categories?post=14478"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bu.edu\/cpo\/wp-json\/wp\/v2\/tags?post=14478"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}