During the week of August 19th
- Site
- Excavate for and install stormwater infiltration system
- Utilities
- Install gas line and meter
- Pluming
- UG plumbing at play support building
- Concrete
- Prep and pour for SOG
- Framing
- Stair #1 framing
During the week of August 26th
- Site
- Excavate for and install stormwater infiltration system
- Plumbing
- UG plumbing at main building
- Framing
- Connector framing