Myles Standish Hall – Saturday Work – 07/23/16
On Saturday, the following construction work will be occurring on site from 7 a.m. to 5 p.m.
- Demolition throughout building – Interior
- Load out of dumpsters on the Beacon Street side of the building – Dumpster will be swapped throughout the day.
- Annex alley – Start forming pads and vault at transformer pad and continue with excavation for alley underground work – Trucks will be loaded out of the alley onto Bay State Road for this work.
- Activities will require workers to be on the roof and trucks and equipment in point park.